Council archive · source document
Stormwater Management Plan -OPW (A) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
Figure 8.1 : Quality MUSIC Model Layout
The locations and details of the water quality treatment devices are shown on
engineering drawings at Appendix A.
Water Quality analysis has been developed in accordance with Noosa
Council, State Planning Policy July 2017 (SPP) and the Queensland Water
Quality Objectives (2009).
Queensland Water Quality Objectives (2009) have been adopted which
recommend the following minimum reductions in mean annual pollutant
loads leaving a development site compared to the developed unmitigated
case:
• 80% reduction in Total Suspended Solid Load;
• 65% reduction in Total Phosphorous Load;
• 45% reduction in Total Nitrogen Load;
• 90% reduction in Gross Pollutant Load.
Quality MUSIC modelling of the proposed treatment train has been
undertaken generally in accordance with Water by Design’s - MUSIC Modelling
Guidelines, Version 1.0-2010.
__________________________________________________________________________
A6769/25/SWMP/Rev OpW(A) – Feb 2025
Page 16 of 9
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.