ORDINARY MEETING AGENDA 20 JUNE 2019
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Landscaping Works
36.37. The development site must be landscaped prior to the commencement of use.
The works must be undertaken in accordance with an Operational Works approval
and the Noosa Plan for that specific area and must include in particular:
a. The landscape areas generally shown on the approved Site Plan/Ground
Floor Plan Rev. A prepared by Andrew McKellar Design dated April 2019
with the following amendments:
i. A minimum 2.0 metre-wide landscaping strip, within the lot, to the
Diamond Lane frontage adjacent to the full length of the building and
outside the area to be dedicated as lane. This landscaping must
comprise a mix of ground covers, shrubs and small trees
ii. The provision of island landscaping within the Opal Street road reserve
in the currently paved area between the scooter spaces and the car
parking spaces. The landscaping is to include a small tree.
iii. All trees to be a minimum pot size of 100 litres and consist of local
native tree species.
iv. Views of the tree planted on site at the corner of Opal and Elm Streets
must not be impeded by the proposed feature wall, the feature wall
must have a maximum height of 1200mm from natural ground level.
b. The retention of the three street trees to the western end of the Opal Street
frontage.
c. Sub-terrain tree planting area demonstrating at least 4m³ area of structured
soils per tree is available for root growth and is not subject to compaction.
d. Details and depths of all landscaping soils, especially where subject to
compaction relating to filling of the site.
e. Details of any signage proposed to be located within areas identified for
landscaping.
37.38. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
Stormwater Drainage
38.39. The site must be provided with a stormwater drainage system connecting to
a lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval.
39.40. The plans submitted for the Operational Works approval must be prepared
and certified by suitably qualified RPEQ and include calculations in accordance
with Queensland Urban Drainage Manual and must confirm that that not increase
in stormwater runoff for all storm events up and including 1% AEP.
40.41. Stormwater runoff from the development must be disposed of on-site without
causing scour, damage or ponding on the subject site or any adjoining property.
Page 26 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.