ORDINARY MEETING AGENDA 18 JULY 2019
39. All carparking shall be kept, maintained and line-marked in a condition fit for
use.
40. All staff carpark spaces shall be clearly defined by line marking each space
with the words "Staff Parking Only" and by sign posting each space with a
similar wording.
Pathway Lighting
41. The existing pathway between the two existing lots shall have lighting installed
from Goodchap Street to the rear boundary of Lot 4. This lighting shall have a
high energy efficient rating to the reasonable satisfaction of Council and be
designed to meet appropriate safety standards and not to adversely impact
residences in the area.
Vegetation Protection & Preservation
42. Vehicular pavements within the drip zone of any of the existing trees on site to
be retained shall be designed as a pervious pavement (such as grass paving
cells or similar), as this will allow water that falls on this surface to penetrate to
the trees root system. The pavement shall be constructed so as not to damage
the tree or their root system and in this regard temporary fencing shall be
provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type
and extent of the pervious pavement and the temporary fencing prior to
obtaining a Development Permit for Operational Works.
Frontage Works
43. Tree planting is required to the Goodchap Street frontage of Proposed Lot 5 in
accordance with Planning Scheme Policy PSP03 Landscaping Plants &
Guidelines.
Roof Water & Stormwater Drainage
44. Stage A - Roof runoff from any new building shall be directed to a rainwater
storage system or tank (minimum storage the greater of 5000 litres or 15
litres/m² of roof area) that is installed to ensure water from the tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water
features, outdoor cleaning, etc) and for use in flushing of toilets internal to the
building. All rainwater tanks are to be designed and installed in accordance
with the Queensland Development Code (QDC), Part 25 - Rainwater Tanks,
and shall be part of the plumbing application in conjunction with the building
approval. The location and capacity of the tanks shall be clearly shown on the
plans submitted for Building Works / Operational Works approval and any
overflow shall be directed to an approved discharge point.
All stages:
45. All stormwater drainage (including roof water overflow from the rainwater
storage system) must be collected and discharged so there is no net increase
in stormwater runoff from the site.
46. A Stormwater Management Plan must be submitted to Council in conjunction
with an operational works application to demonstrate how water quality and
quantity objectives are to be met as follows:
No increase in peak flow runoff from the site up to and including a one in 100
year ARI.
80% reduction in total suspended solids;
60% reduction in total Phosphorus
45% reduction in total Nitrogen compared to an unmitigated development
scenario.
Page 9 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.