Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110

of 245

Page text read automatically using OCR, there may be inaccuracies

PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT                                      11 JUNE 2024


      44.    Directional signage must be provided to direct visitors and customers to the car parking
             spaces provided on site.
Security Access to Carpark
    45. Where access to the carpark is proposed to be restricted by a security gate, provision
          must be made for queuing of vehicles clear of the roadway while waiting for the security
          gate to open.
    46. Where a secure carpark services a commercial use on the site, the security gate must
          remain open at all times while commercial uses on the site are open for business. The
          requirements of this condition must be included in the Community Management
          Statement for anybody corporate for the subject site.
Service Vehicles
       47.   Service vehicle parking, manoeuvring and standing spaces must be provided on the
          site. The works must be undertaken in accordance with an Operational Works
          approval.
Pedestrian and Bicycle Facilities
     48.      Pedestrian and bicycle facilities must be provided for the development. The works must
             inc lude in particular:
             a.     signage and lighting at strategic locations to direct people to building entries and
                  public toilet facilities;
             b. a total of 53 bicycle parking spaces; and
               c. end of trip facilities involving 27 lockers, 6 showers and change rooms within the
                development.
Water quality and quantity
    49. The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and the Queensland Urban Drainage Manual.
    50. A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and the
          Bioretention Technical Design Guidelines (Water by Design, 2012), and must include in
          particular:
          a. stormwater quality treatment devices of a size and location generally in accordance
              with those shown in Drawing No. C6070/20/P07 prepared by Walsh Consulting
              Engineers dated 26/10/2021, with the exception of the following:
                   i.   Bioretention filter area is to be increased in size to the area stated for
                        bioretention surface area on the above referenced plan
             b. bioretention devices which:
                  i.    are designed generally in accordance with IPWEQA Standard Drawing No.s
                        DS-073, DS-075 and DS-076
                 ii.    are provided with a free-draining outlet from the sub-soil drainage system
     51.     Permanent educational signage* must be erected to educate the residents of /
             customers to the development about the function of the bioretention device(s). The
             dimensions, standard, presentation and location of the educational signage must be in
             accordance with an Operational Works approval.




                                                                                          Page 6 of 12

Log in to download the original (FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21_0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.