Original source · versioned page text
Appendix D - Engineering Report.pdf
It is also proposed to install 6x22.5kL (135kL total) of rainwater harvesting tanks within the new development area. Refer to preliminary engineering drawing number C6070/20/P06 attached as Appendix B for details. Harvested rainwater will be used onsite for topping up of new pools and irrigation of landscaped areas. This approach to water quality management has generally been accepted as part of previous development applications for the site. No further water quality management is proposed as part of this development application. 6.0 SEWERAGE RETICULATION Refer to preliminary engineering drawing number C6070/20/P04 attached as Appendix B for details of the existing sewerage reticulation network. The proposed extensions to the Noosa Springs Golf Resort and Spa will be serviced by an existing gravity sewer main, contained within a registered easement and constructed as part of previous development works. The existing parent infrastructure will be assessed for suitability and upgraded as required. The site slopes from east to west at moderate grades and can readily accommodate a new internal gravity sewer network. Detailed design of the internal sewer network will be provided by the Hydraulic Consultant and lodged as part of future Operational Works/Building Applications.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.