Appendix D - Engineering Report
Table 2: Earthworks Code – Criteria Assessment
Performance Outcome Project Outcome
Earthworks
PO1 Proposed finished surface levels will ensure land is free
draining.
PO2 Not Applicable.
Earthworks fill will be undertaken generally in accordance
with Council’s Planning Scheme Policy PSP6 Engineering
PO3 design standards – earthworks.
Proposed construction works will be designed in accordance
with AS 3798.
Appropriate control measures will be implemented
throughout the bulk earthworks phase to minimise the
PO4 impact of dust and noise on the local area. A construction
management plan detailing these measures will be
prepared and lodged prior to commencement of works.
PO5 Cleared vegetation will be disposed of in an environmentally
friendly manner.
Any required fill will be suitable for the proposed use and
PO6 will not result in contamination of the land. Sources of fill
will be detailed in the construction management plan.
Haulage routes will be detailed in the construction
PO7 management plan. A dilapidation report will be prepared for
the existing road network to ensure no adverse effects to
Council infrastructure.
The extent of earthworks is contained with the subject site.
PO8 The areas that require earthworks, including building pads,
pools and car parking areas are clearly defined and easily
accessible.
Cut/fill will be minimised as far as practical. It is noted that
PO9 some portions of the new hotel require earthworks cut
>1.5m.
Proposed earthworks will not impact on existing
PO10 infrastructure. Proposed works are fully contained within
the subject site.
Adequate control measures will ensure no adverse impacts
to existing watercourses, drainage lines, wetlands. Some
PO11 minor clearing of vegetation is required to support the
proposed works. Refer to the Ecology Report, prepared by
Gondwana Ecology, for details.
PO12 Not Applicable.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.