Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix D - Engineering Report

of 60

Page text read automatically using OCR, there may be inaccuracies

             Table 3: Landslide Hazard Overlay Code – Criteria Assessment
Performance Outcome                            Project Outcome
Landslide hazard
                          The proposed development is located on land identified as
           PO1            a landslide hazard. A site-specific geotechnical assessment
                          will be prepared by a qualified geotechnical engineer and
                          lodged with Council.
Essential community infrastructure
         PO2              Not Applicable
Sloping Sites, landscape character and scenic amenity
                          The proposed hotel will be adequately screened from the
                          road frontage. The structure has been designed to follow
         PO3              the natural landform via a series of stepped levels.
                          Earthworks cut and fill will be required but has been
                          minimised as far as practical. Disturbed areas will be
                          revegetated and landscaped following completion of works.
         PO4              Proposed access and carparking will be located over flatter
                          portions of the site.

Log in to download the original (Appendix D - Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.