Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix D - Engineering Report

of 60

Page text read automatically using OCR, there may be inaccuracies

             Table 4: Waste Management Code – Criteria Assessment
Performance Outcome                          Project Outcome
Waste separation
                        Construction phase waste management measures will be
                        detailed in the construction management plan.

         PO1            Operational phase waste management measures have been
                        detailed in the ‘Noosa Springs Resort and Spa Hotel
                        Development Operating Philosophy’, prepared by Vision
                        Hospitality.
                        Operational phase separation and storage of waste will be
                        undertaken at various locations within the site. Refer to the
         PO2            ‘Noosa Springs Resort and Spa Hotel Development
                        Operating Philosophy’, prepared by Vision Hospitality for
                        details.
Design and location
                        A consolidated waste pick-up area is provided at the south
                        eastern boundary of the site. Council’s Waste Collection
         PO3            Vehicles may enter via the service road, collect waste,
                        perform a U-turn in the dedicated turning bay and leave the
                        site in a forward gear.
                        Refer to the ‘Noosa Springs Resort and Spa Hotel
         PO4            Development Operating Philosophy’, prepared by Vision
                        Hospitality for details of waste storage areas/containers.
                        Refer to the ‘Noosa Springs Resort and Spa Hotel
         PO5            Development Operating Philosophy’, prepared by Vision
                        Hospitality for details of waste storage areas/containers.
Water management
                        Refer to the ‘Noosa Springs Resort and Spa Hotel
                        Development Operating Philosophy’, prepared by Vision
                        Hospitality for details of waste storage areas/containers.

         PO6            Hydraulic engineering plans will be prepared and lodged as
                        part of future detailed design. These plans will include
                        details of proposed bin washdown areas.

                        Future applications to UnityWater will include a request for
                        trade waste permits.

Log in to download the original (Appendix D - Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.