Original source · versioned page text
Appendix D - Engineering Report
Table 4: Waste Management Code – Criteria Assessment
Performance Outcome Project Outcome
Waste separation
Construction phase waste management measures will be
detailed in the construction management plan.
PO1 Operational phase waste management measures have been
detailed in the ‘Noosa Springs Resort and Spa Hotel
Development Operating Philosophy’, prepared by Vision
Hospitality.
Operational phase separation and storage of waste will be
undertaken at various locations within the site. Refer to the
PO2 ‘Noosa Springs Resort and Spa Hotel Development
Operating Philosophy’, prepared by Vision Hospitality for
details.
Design and location
A consolidated waste pick-up area is provided at the south
eastern boundary of the site. Council’s Waste Collection
PO3 Vehicles may enter via the service road, collect waste,
perform a U-turn in the dedicated turning bay and leave the
site in a forward gear.
Refer to the ‘Noosa Springs Resort and Spa Hotel
PO4 Development Operating Philosophy’, prepared by Vision
Hospitality for details of waste storage areas/containers.
Refer to the ‘Noosa Springs Resort and Spa Hotel
PO5 Development Operating Philosophy’, prepared by Vision
Hospitality for details of waste storage areas/containers.
Water management
Refer to the ‘Noosa Springs Resort and Spa Hotel
Development Operating Philosophy’, prepared by Vision
Hospitality for details of waste storage areas/containers.
PO6 Hydraulic engineering plans will be prepared and lodged as
part of future detailed design. These plans will include
details of proposed bin washdown areas.
Future applications to UnityWater will include a request for
trade waste permits.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.