Appendix D - Engineering Report
Table 4: Waste Management Code – Criteria Assessment - Continued
Performance Outcome Project Outcome
Safety and protection of infrastructure when demolishing or removing buildings
A Dial Before You Dig enquiry has been lodged. Existing
infrastructure will be located and marked prior to
commencement of works.
PO7 Redundant infrastructure will be removed and capped as
required.
Any damage to Council/Service Provider infrastructure shall be
rectified at the developer’s expense.
PO8 Construction phase waste management measures will be
detailed in the construction management plan.
PO9 Earthworks cut/fill will be designed to minimise the potential
for both cut volumes to spoil and fill volumes imported.
PO10 Not Applicable.
PO11 Not Applicable.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.