Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix D - Engineering Report

of 60

Page text read automatically using OCR, there may be inaccuracies

      Table 4: Waste Management Code – Criteria Assessment - Continued


 Performance Outcome                             Project Outcome
Safety and protection of infrastructure when demolishing or removing buildings
                           A Dial Before You Dig enquiry has been lodged. Existing
                           infrastructure will be located and marked prior to
                           commencement of works.

          PO7              Redundant infrastructure will be removed and capped as
                           required.

                           Any damage to Council/Service Provider infrastructure shall be
                           rectified at the developer’s expense.
          PO8              Construction phase waste management measures will be
                           detailed in the construction management plan.
          PO9              Earthworks cut/fill will be designed to minimise the potential
                           for both cut volumes to spoil and fill volumes imported.
         PO10              Not Applicable.
         PO11              Not Applicable.

Log in to download the original (Appendix D - Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.