Appendix E - State Code 1 Template Response

Attached to the e-mail Commercial Business Type 2 Medical (Doctor's Practice) - MCU18/0195.

of 19
 Performance outcomes                                  Acceptable outcomes                                    Response
 certified geotechnical assessment, prepared in
 accordance with Volume 3 of the Road planning and
 design manual 2nd edition, Department of Transport
 and Main Roads, 2016, is provided.
 PO7 Excavation, boring, piling, blasting or fill      No acceptable outcome is prescribed.                   Not Applicable – no earthworks are proposed or
 compaction during construction of a                                                                          required.
 development does not result in ground
 movement or vibration impacts that would cause
 damage or nuisance to a state-controlled road,
 road transport infrastructure or road works.

 Note: To demonstrate compliance with this
 performance outcome, it is recommended an RPEQ
 certified geotechnical assessment, prepared in
 accordance with Volume 3 of the Road Planning And
 Design Manual 2nd edition, Department of Transport
 and Main Roads, 2016, is provided.
 PO8 Development involving the haulage of fill,        AO8.1 Fill, extracted material and spoil material  Not Applicable – no earthworks are proposed or
 extracted material or excavated spoil material        is not transported to or from the development site required.
 exceeding 10,000 tonnes per year does not             on a state-controlled road.
 damage the pavement of a state-controlled road.

 Note: It is recommended a pavement impact
 assessment is provided in accordance with the Guide
 to Traffic Impact Assessment, Department of
 Transport and Main Roads, 2017.
 PO9 Filling and excavation associated with the        No acceptable outcome is prescribed.                   Not Applicable – no earthworks are proposed or
 construction of vehicular access to a                                                                        required.
 development does not compromise the operation
 or capacity of existing drainage infrastructure for
 a state-controlled road.
 PO10 Fill material used on a development site         AO10.1 Fill material is free of contaminants           Not Applicable – no earthworks are proposed or
 does not result in contamination of a state-          including acid sulfate content.                        required.
 controlled road.
                                                       Note: Soils and rocks should be tested in accordance
                                                       with AS 1289.0 – Methods of testing soils for

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                         Page 3 of 19

Log in to download the original (Appendix E - State Code 1 Template Response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.