ORDINARY MEETING AGENDA                                                    15 NOVEMBER 2018


          f.    Provision of 20 bicycle parking spaces.
    50.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
    51.   Directional signage must be provided to direct visitors and customers to the car parking
          spaces provided on site.
    Service Vehicles
    52.   Service vehicle parking, manoeuvring and standing spaces must be provided on the
          site. The works must be undertaken in accordance with an Operational Works
          approval.
    Pedestrian and Bicycle Facilities
    53.   Pedestrian and bicycle facilities must be provided for the development. The works must
          be undertaken in accordance with an Operational Works approval and must include in
          particular:
          a.    a 2 metre wide footpath within the road verge for the entire length of the site’s
                frontage to Mary Street.
          Condition 53 is imposed pursuant to s128 of the Planning Act 2016 being necessary
          trunk infrastructure identified by Council’s LGIP to service the development.
    Stormwater Drainage
    54.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and must include in particular:
          a.    the works shown on drawing number 17699-SK101 Revision A prepared by TOD
                Engineers and Project Managers dated 17 August 2018, with the inclusion of the
                following:
                i.    The storage tank must have sufficient capacity to cater for the runoff from
                      the driveway in a 1%AEP rain event as a minimum.
                ii.   A back up power system for the pump that is independent of the mains
                      network.
    Acid Sulfate Soils
   55.    All works must be carried out in accordance with an Acid Sulfate Soil and Groundwater
          Management Plan for the development prepared by a qualified person* and referenced
          in a Development Permit for Operational Works. The Acid Sulfate Soil and
          Groundwater Management Plan must specifically address how lowering of the
          groundwater level as a result of the works will be avoided.
          *(Refer to Advisory Note)
   56.    All waters, including stormwater runoff, groundwater seepage and leachate from acid
          sulfate soils must achieve the following quality prior to release from the site:
          a.   a pH range of 6.5-8.5 pH units
          b.   50mg/L maximum total suspended solids concentration
          c.   0.3mg/L maximum total iron concentration
          d.   0.2mg/L maximum total aluminium concentration
          e.   no visible plume at either the point of release from the site or within a
               waterway




                                                                                   Page 44 of 47
Log in to download the original file

2018-11-15 Ordinary Meeting Agenda(PDF, 920KB).pdf · 943 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.