57. The basement must be designed and constructed as a water excluding structure in
accordance with Australian Standard AS3735 "Concrete Structures for Retaining
Liquids" to ensure groundwater does not enter the basement after construction is
completed.
58. All treated material must undergo verification testing at the rate of one sample per
250m3 throughout the duration of the excavation phase of the development. The
verification testing must be undertaken by a qualified person* using the SPOCAS
or Chromium Reducible Sulphur testing suite, and the results must be submitted
to Council for appraisal.
Electricity and Telecommunication Services
59. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
60. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Earthworks and Retaining Walls
61. All earthworks must be undertaken in accordance with an Operational Works approval,
and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
62. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Preparation of a Preliminary Construction Management Plan
63. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
e. identification of complaint management procedures including:
Page 45 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.