2018-07-06 SM - Attachment 1 to Item 5 - Level of Service Catalogue
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Service Listing 1 of 1
Service Output RECREATION PARKS
Provision and maintenance of recreation parks, botanical gardens and
associated facilities
Service Activity Maintenance & Operations
The activities include maintenance of turf & landscaping and hard
infrastructure such as picnic shelters, barbeques, playground equipment,
and exercise facilities together with operational activities such as mowing
and cleaning.
Responsible Area1 Department Branch
Infrastructure Services Civil Operations (Parks & Gardens)
Civil Operations (Bridge Crew)
Community Services Community Facilities
Cost Centres Parks and Gardens 2301
Arborist Services 2303
Hastings Street Maintenance Levy 2303
Sunshine Beach Skate Park 2609
Department Management – Director 1900
Infrastructure Services
Management Civil Operations 2000
Works Operations Coordination 2021
Key Statistics2 # Recreation Parks 220 (approx. 364 ha)
# Playground installations 252 units at 83 locations
# Shelters 107
# Exercise equipment 4 installations
# Sport surfaces (basketball etc.) 21 units at 15 locations
# Skate bowls/ramps 17 units at 8 locations
# Barbecues 31 double electric; 3 single electric; 4
wood
Legislative responsibility to The Land Act 1994 (as trustee of reserves)
provide this service
ACTIVITY SERVICE LEVEL TARGET
Maintenance
Routine activities include inspections and maintenance activities such as spot weed spraying, removal of
accumulated leaf litter, pruning to maintain canopy / tree or shrub shape, turf maintenance, tree maintenance,
mulching and re-planting as required.
Also includes works to maintain park infrastructure such as fencing/bollards, electrical and irrigation systems, water
fountains, shelters, seating, barbeques, playground & recreation facilities such as exercise equipment, spray park/s,
skate & BMX facilities, outdoor basketball courts etc.
Explanatory note:
The asset management system provides for a 6 monthly and an annual formal inspection regime for developed
recreational parks.
In addition, playground & fitness equipment installations at high priority locations are inspected fortnightly and all
other playground installations are inspected every two months (as per AS/NZS 4486).
When the playground inspection is done a quick visual scan is also done of the immediate area to pick up any
apparent maintenance issues. Similarly where a reactive maintenance request is received the same visual checks
occur.
Page 105
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.