Essentially this results in a higher level of inspection than captured in Council’s systems.



Cyclic inspections                       Developed Park Inspections               6 monthly formal inspection program
                                                                                  (except for Noosaville Foreshore
                                                                                  which is inspected by the Roads
                                                                                  Landscaping crew at same frequency
                                                                                  as program for road landscaping
                                                                                  activities).

                                                                                  Note: The six monthly inspection is
                                                                                  based on a checklist that covers
                                                                                  landscaping, trees, turf and hard
                                                                                  infrastructure items (other than
                                                                                  playgrounds which have a different
                                                                                  inspection regime).
                                         Comprehensive Park Inspection            Annual

                                         Playgrounds – Priority locations         Fortnightly

                                                                                  Note:

                                                                                  Exceptions that are not captured in
                                                                                  the Asset Management system:
                                                                                   Pirate Park, Noosaville (Almost
                                                                                      daily in peak periods of use)
                                                                                   Skate facility, Peregian Beach
                                                                                      (Twice weekly)

                                         Playgrounds – all other locations        Every 2 months (6 times per annum)

                                         Playgrounds – comprehensive              Annual
                                         (detailed check/bolts
                                         removed/foundations checked etc.)

                                         WHS inspections:
                                         - Botanical Gardens                      Quarterly
                                         - Tewantin Splash Park

                                         Skatepark Sunshine Beach                 Daily (by NAC staff)

Scheduled work                           Generally as identified from inspections with work based on site condition and
                                         seasonal needs with specific work detailed below.

                                         Special Precincts - Wedding groves
                                         (5 sites at Main Beach, Noosa            Twice weekly (contract work)
                                         Heads)3
                                         Coconut trees at Noosaville              Twice yearly (not a documented
                                         Foreshore, Noosa Heads Main              inspection regime)
                                         Beach & Noosa Waters (remove
                                         flowering stems/fruit)

Reactive work4                           Issue                                    Target days to complete
                                         Parks landscape maintenance              20 business days

                                         Tree trimming                            20 business days

                                         Tree removal                             30 business days

                                         Trees fallen                             5 business days

                                         Weed spraying                            10 business days


                                                                                                         Page 106
Log in to download the original file

2018-07-06 SM - Attachment 1 to Item 5 - Level of Service Catalogue(PDF, 5MB).pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.