2018-07-06 SM - Attachment 1 to Item 5 - Level of Service Catalogue
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Minor GPTs 3 times per year (tri-annual)
Note: Audit done on bio-retention
basins and data validated. Program
being developed to bring these assets
to standard and then operating costs
will need to be funded in budget for
routine maintenance work. Currently
not done – service gap.
Park Road slip area (beginning of
Boardwalk to First Point):
• Subsoil drainpipe camera check Annually
• Dipping points checked/cleaned Quarterly
• During intense rainfall Weekly
Scheduled Work As identified from inspections (defects & proactive interventions) to maintain free
flow of stormwater with specific requirements as follows:
GPTs (major) 4 times per year (quarterly)
Note: Audit done on bio-retention
basin and data validated. Program
being developed to bring these assets
to standard and then operating costs
funded in budget for routine
maintenance work. Currently not done
– service gap.
GPTs(minor) 3 times per year (tri-annual)
De-silting of stormwater lines As required approx. 4 yearly
4
Reactive work All requests 20 business days (target days for
completion)
Stormwater “as constructed” search 2 business days
Flood alert & mitigation maintenance and operations
[Works to maintain, repair and operate the flood alert system and flood mitigation infrastructure]
Cyclic inspections Flood alert towers/structures Annual
Flood alert stations (telemetry) Annual (with BOM technician)
Flood maximum height gauges (static Annual
measuring tool in event of telemetry
failure)
5
Daintree Estate flood mitigation &
drainage inspections check:
• Concrete and earth levee (qualified Annual (September)
professional)
• Level of debris/blockages along Annual pre-wet season + as required
levee wall
• culverts and ensure clear of debris Annual pre-wet season + as required
blockage
Scheduled work As identified from inspections (defects & proactive interventions) with specific
requirements as follows:
Purchase 6 bottles of nitrogen gas (used Annual
Page 132
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.