Original source · versioned page text
Minor Change Existing Approval 132002.220285.I (As Published)
River Flooding
135. No development is to be undertaken below the Q100 line indicated on Stockwell Drawing
Q0201.01b/P dated 19th March 2003.
Eenie Creek Road
136. Prior to the use commencing the applicant shall, at no cost to Council, construct two
additional traffic lanes on Eenie Creek Road between Eumundi Road and Reef Street, to
Council’s reasonable requirements, all engineering standards to be generally consistent with
those applicable to the existing two lane construction and include works associated for an
intersection to the SBC off Eenie Creek Road required by Condition 138.
137. The use shall not commence until 31 January 2006 or until both Eenie Creek Road Stage 2
between Reef Street and Cooyar Street and Walter Hay Drive between Emu Mountain Road
and Eenie Creek are operational to traffic as two way, two lane roads, whichever first occurs.
138. The applicant shall design and construct, at no cost to Council, a two-lane circulating
roundabout intersection to the SBC from Eenie Creek Road, generally in the location shown
on the approved drawings.
The intersection and all associated works providing for connection of the pavement and
stormwater drainage infrastructure to the Eenie Creek Road infrastructure to be constructed
pursuant to condition 136, shall be constructed prior to the commencement of the use under
a development permit, and shall be to the reasonable satisfaction of the Manager Land
Development.
Walter Hay Drive
139. The applicant shall dedicate as road reserve, at no cost to the Council, sufficient land from
lot 1 on SP 100885 for the construction of Walter Hay Drive in accordance with Council’s
approved alignment generally as indicated in the planning and design concept for Walter Hay
Drive, approved by Council on 1 May 2003, as further modified by GHD plan 41-12240-C027
revision B or as subsequently approved by Council for the detailed design.
140. The applicant will meet Council’s reasonable design costs and construct a northern
roundabout on Walter Hay Drive and two additional lanes between that roundabout and
Eenie Creek Road in accordance with Council’s approved alignment generally as indicated
in the planning and design concept for Walter Hay Drive, approved by Council on 1 May
2003, as further modified by GHD plan 41-12240-C027 revision B or as subsequently
approved by Council for the detailed design. The applicant will also undertake all design and
construction required to accommodate the necessary changes in alignment to provide
access and roadway capacity associated with this development
Possible Agreement
141. Deleted.
142. The applicant will construct the section of the internal loop road that is part of Stage 1 of the
SBC generally in accordance with the approved plans. Working drawings in respect of the
internal loop road shall provide road widths suitable for accommodating the traffic loadings
expected, allowing manoeuvring of all vehicles including articulated and accommodating
cycle and pedestrian paths generally in accordance with Council’s Engineering Standards
for roads of that type shall be to the reasonable satisfaction of the Manager of Land
Development and shall be submitted with the application for operational works. Road
pavement widths shall be reduced where possible to enable retention of vegetation.
143. The design of all sections of the internal loop road shall be consistent with Council’s normal
design standards, to facilitate possible future dedication of the loop road and the connections
to the external site access intersections.
Page 22 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.