Stormwater Management Plan
                                                                                        ~,.., Cardno@
>     Rehabilitation of Keyser Creek       Waterway Corridor.        Rehabilitation will include the stabilisation of
      banks where required, weed removal and revegetation. A dam already exists in Keyser Creek, upstream
      of the crossing linking Areas F and G in Precinct 2. Rehabilitation of this area will improve its functionality
      as a   public open space, and also improve its ecological value.
>     Wastewater Management. The proposed development has reticulated water and sewerage. Previous

      development applications for this site have utilised on-site treatment and disposal of effluent via irrigation.
      This development plan therefore reduces the risk of contaminants from effluent being discharged into
      Lake Weyba.

The   impact of community education, bio-retention tree pits, litter baskets, buffer area revegetation and
rehabilitation has not been included in the MUSIC modelling, unless stated otherwise. Therefore the MUSIC
results are a conservative assessment of the improvement in stormwater quality that can be achieved on
site.

The proposed treatment devices have been located outside of ecologically constrained areas and outside of
the 100 year ARI extent of inundation.


6.2              Treatment Device Details

6.2.1            Rainwater Tanks

All practically available roof area will be connected to the proposed rainwater tanks so that stormwater
harvesting on site is maximised.
10 kL tanks are proposed for each residential lot. 5 kL rainwater tanks are proposed for each townhouse or
retirement villa.     These tanks will likely be combined into a smaller number of larger tanks for irrigation of
communal areas. A 120 kL tanks is proposed for the apartment buildings. These proposed rainwater tanks
sizes    are   around twice the standard rainwater tank sizes        currently required by QDC and the former
Maroochy Shire Council.
Due to the large size of the proposed rainwater tanks it is likely that they will be underground systems. An

example of this kind of set-up from a local manufacturer (Action Tanks) is shown in Appendix D.
Pre-treatment of roof water via a litter screen is recommended, as shown in Appendix D. This litter screen
has not been included in the MUSIC modelling.


6.2.2            Bio-retention Basins

End-of-line bio-retention basins will be utilised in areas where the slopes are too steep or there is insufficient
area for bio-retention     gardens within the road reserve.    Bio-retention tree-pits will also be utilised in these

areas, where practical, to provide some pre-treatment of runoff.           However, these were not included in the
MUSIC modelling (refer Section 7).

The proposed bio-retention basins and gardens will provide some minimal attenuation of peak flows. Most of
the attenuation of major peak flows on site will be provided        by the proposed road culvert crossings (refer
Flood Study, Cardno, October 2012). The bio-retention basins for catchments 3_1_4, 3_1_5 and 4_L will be
combined into the detention basins proposed for these sub-catchments.               The design of these detention
basins will be conducted at detail design stage, however, indicative sizes are shown in Figure 3, 4 and 5.
The     remaining bio-retention basins will only be utilised for stormwater quality purposes.         Therefore the
basins will not be as deep.

For the detailed civil design of each basin the following elements should be included.

>     The overflow pits and weirs should ideally be located near the inlet points, so that during major rainfall
      events the scouring of bio-retention vegetation is minimised.

>     Access ramps should be provided for each basin so that maintenance vehicles can gain access to the
      base.

>     Coarse sediment forebays or sedimentation ponds should be installed at inlet points.

>     The perforated pipe underdrainage should be spaced at approximately 2 metre intervals.



Northbrook Corporation Pty Ltd                         Version 2                                     29 November 2012

SMP_v2.docx                                     Commercial in Confidence                                      Page 10

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗