Stormwater Management Plan
<..f) Carcln @
> Clean out points should be provided for all underdrainage.
> Litter baskets should be installed on the overflow pits.
The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.3 metres. The filter depth assumed was either
0.6 or 0.8 metres. Transition and drainage layers will also be required underneath the filter media. In areas
outside of the Asset Protection Zone (APZ)the bio-retention basins can be planted with suitable trees such
as melaleucas. These require a filter depth of 0.8 metres. The advantage of planting trees in bio-retention
basins is that they improve the aesthetics and bio-diversity. They also reduce the likelihood of blockage of
the filter media. Recent studies have shown they do not increase the risk of blockage of the underdrainage.
A typical bio-retention basin cross-section is shown in Image 1.
Overflow Weir
~
Clean Out Point
Inlet Pipe
0.3m Extended Detention Depth
Concrete Lined
Coarse Sediment 0.6m Filter Media (Sandy Loam)
Forebay
0.1 m Transition Layer (Coarse Sand)
~0.2m Drainage Layer (Fine Aggregate)
Geotextile Fabric
Underdrainage Outlet Pipe
(0.50/0 slope)
Image 1 Typical Bio-retention Basin Cross-section
6.2.3 Bio-retention Gardens
Bio-retention gardens are similar to bio-retention basins, except that they are smaller in size and located
within the road reserve, and so can be incorporated into the landscaping. They treat runoff from surrounding
areas before it is discharged to the stormwater pipes.
They are effective treatment devices in relatively flat and low-lying areas as they do not need as much
vertical differentiation.
The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.15 metres. The filter depth assumed was 0.8
metres, to allow for the planting of trees. Transition and drainage layers will also be required underneath
the filter media.
A typical bio-retention garden will have a filter area of 9 m2 and a surface area of around 20 m2 to allow for
batters, coarse sediment forebay and field inlet. They will each treat runoff from every two lots on average.
Larger gardens will be positioned in areas where there is sufficient space.
The location and design of the bio-retention gardens will be detailed during the design of the Precincts.
Road reserve widths of at least 15 metres will be necessary to accommodate them. They can be utilised as
traffic calming devices.
To improve the treatment efficiency of the bio-retention gardens the overflow from the rainwater tanks will be
connected directly to the underground drainage. This will ensure that relatively clean roofwater is not re-
contaminated, it will improve the drainage efficiency of the road reserve and so reduce the risk of local
flooding. A sensitivity analysis looking at the impact of draining the rainwater tanks to the bio-retention
gardens will be conducted.
For the detailed civil design of each basin the following elements should be included.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.