    Stormwater Management Plan
                                                                                               ~,.., Cardno@
    Table 7-2        Rainwater Tank Details


     $f~I"I~                                         ~~

I                          I         ~~
                                     (J!
                                     170
                                                       ~
                                                       ~
                                                         1956.7
                                                                                ~00:1?l
                                                                                ~
                                                                                 2.237
            1_B_1

            1_B_2                    210                 2417.1                  2.764

            1_B_3                    90                  1035.9                  1.184

            1_B_4                    130                 1496.3                  1.711

            1_B_5                    130                 1496.3                  1.711

            1_C_1                    120                 1697.3                  4.000

            1_D_1                    415                 5251.1                  7.802

            1_E_1                    600                 4261.5                  11.280

            2_F_1                    400                 3604.0                  5.264

            2_G_1                    1240                11172.4                 16.318

            3_H_1                    60                   814.8                  1.128

            3_H_2                    140                 1611.2                  1.955

            3_H_3                    290                 3337.5                  4.042

            3_H_4                    150                 1351.5                  1.974

             3_1_1                   520                 4685.2                  6.843

             3_1_2                   350                 3153.5                  4.606

             3_1_3                   470                 4234.7                  6.185

             3_1_4                   570                 5135.7                  7.501

             3_1_5                   120                 1081.2                  1.579

             4_K                     60                   690.6                  0.790

              4_L                    500                 6005.4                  9.400




    7.3.2            Bio-retention Basins and Bio-retention Gardens

The bio-retention basins were set up using the Healthy Waterways MUSIC Modelling Guidelines. The filter
    area and   surface area were assumed to be the same, so as to allow for future changes in the batter design.
This is a conservative assumption as it underestimates the storage volume available. The indicative sizes of
the basins shown in Figures 3, 4 and 5 allow for a depth of 1 metre and a batter slope of 1 in 4. The bio-
    retention/detention basins assumed a depth of 1.5 metres. Sufficient area for coarse sediment forebays and
field inlets was also provided.

A saturated hydraulic conductivity of 200 mm/hr was assumed. This is typical of sandy loam filter media.
The TN content of the filter media             was   assumed to be 800 mg/kg.            The
                                                                          orthophosphate content was
    assumed to be 50 mg/kg. The bio-retention devices were assumed to be planted with effective nutrient
    removal plants.

A sensitivity analysis was conducted where the saturated hydraulic conductivity was reduced to 50 mm/hr, to
    determine the potential impact of filter blockage.

    No exfiltration was assumed.          The overflow width   was   assumed to be one tenth of the surface area as
    recommended by the guidelines.

The extended detention depth of the bio-retention basins was assumed to be 0.3 metres.                The extended
    detention depth for bio-retention gardens was assumed to be 0.15 metres.

The bio-retention gardens in each sub-area were combined into the one treatment node.


    Northbrook Corporation Pty Ltd                          Version 2                                29 November 2012

SMP_v2.docx                                          Commercial in Confidence                                Page 16

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.