Council archive · source document
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208
Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..J’) Carclno
The removal of plants, dead or diseased vegetation or weeds shall be disposed offsite at an
appropriate waste management facility.
Equipment Needs
The equipment required to undertake regular maintenance to the bioretention systems will be standard
hand held landscaping tools. No specific mechanical equipment is expected to be required for the
maintenance of the basins unless resetting is required.
Occupational Health and Safety
The maintenance activities are to be undertaken in accordance with all current occupational and
workplace health and safety legislation, regulations, codes of practice or manufacturers guidelines.
For maintenance access, pathways have been provided for in the design of the bio-retention basins.
As noted above no mechanical equipment is required unless resetting is required. The batter grades
are considered to be acceptable and do not pose an occupational health and safety issue given proper
training to maintenance personnel.
The application of pesticides or herbicides in response to any weed outbreak, which cannot be
controlled via manual removal, is to be undertaken by maintenance personnel in accordance with
manufacturer’s guidelines in consultation with the Landscape Architect. Protective measures are to be
implemented so as to minimise exposure to personnel, with personal protective measures to be the
final hierarchical option.
While maintenance is being undertaken consideration of pedestrians and cyclists is to be made due to
the close proximity of the footpaths. To avoid any safety concerns it is recommended that temporary
warning signs be placed at a sufficient distance to allow pedestrians and cyclists to become aware of
possible maintenance vehicles / personnel when maintenance is being undertaken.
North brook Corporation Pty Ltd 29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App F -
Maintenance Plan.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.