Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                             <..J’) Carclno

         The removal of   plants, dead or diseased vegetation                      or   weeds shall be   disposed offsite at an
         appropriate waste management facility.



Equipment Needs
         The equipment required to undertake regular maintenance to the bioretention systems will be standard
         hand held       landscaping tools.                No specific mechanical equipment is expected to be required for the
         maintenance of the basins unless resetting is required.




Occupational Health and Safety
         The maintenance activities are to be undertaken in accordance with all current occupational and
         workplace health and safety legislation, regulations, codes of practice or manufacturers guidelines.

         For maintenance access, pathways have been provided for in the design of the bio-retention basins.
         As noted above no mechanical equipment is required unless resetting is required. The batter grades
         are considered to be acceptable and do not pose an occupational health and safety issue given proper

         training to maintenance personnel.

         The  application of pesticides or herbicides in response to any weed outbreak, which cannot be
         controlled via manual removal, is to be undertaken by maintenance personnel in accordance with
         manufacturer’s guidelines in consultation with the Landscape Architect. Protective measures are to be
         implemented so as to minimise exposure to personnel, with personal protective measures to be the
         final hierarchical option.


         While maintenance is being undertaken consideration of pedestrians and cyclists is to be made due to
         the close proximity of the footpaths. To avoid any safety concerns it is recommended that temporary
         warning signs be placed at a sufficient distance to allow pedestrians and cyclists to become aware of
         possible maintenance vehicles / personnel when maintenance is being undertaken.




North brook Corporation Pty Ltd                                                                                 29 Novem ber 2012

O:\5101-19-03\wp\R3v2 SMP\Appendices\App F   -
                                                 Maintenance Plan.docx                                                    Page 3

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.