Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                 ENG
                                                  Engineering Report & Stormwater Management Plan
                                          Date:          27/01/2015     Document No.:        14012-ENG-04.Docx

                                           By:              AvT          Revision No.:              F


                     a. Stormwater Quality Management
The proposed stormwater drainage system has been designed to exceed the requirements for
water quality as specified in the State Planning Policy (2013). This is achieved by providing two
treatment measures that can independently treat the stormwater runoff to meet the water
quality objectives. The first system to treat the stormwater runoff is the in ground proprietary
device and the second system is a biofiltration system. Both of these systems have been sized
to independently treat the stormwater runoff on their own, however both will be provided.
Typically both systems will be in use with the runoff from each catchment being first treated
by the in ground system to meet the water quality objectives and then through the
bioretention system which will effectively treat the stormwater runoff twice. In the event that
one of the systems fails then as a backup system the other system will treat the runoff to
meet the water quality objectives.

     State Planning Policy
The State Planning Policy December 2013 applies for stormwater quality management and
management of new or expanded non-tidal artificial waterways applies to development that is
outlined below in Table 5.1.


                    HEALTHY WATERWAYS POLICY CHECKLIST                                   YES / NO
     Material change of use for urban purposes that involves a land area
     greater than 2500m2 that:
        will result in an impervious area greater than 25% of the net
        developable area                                                                   YES
          Will result in 6 or more dwellings                                               NO
     Reconfiguring a lot for urban purposes that involves a land area
     greater than 2500m2 and will result in six or more lots:
                                                                                           YES
     Operational works for urban purposes that involve disturbing more
     than 2500m2 of land
                                                                                           YES
      Table 5.1:      Water Quality Objectives

As the proposed development triggers one or more applicable items in the above Table 5.1,
the State Planning Policy December 2013 is applicable and compliance will be expected by the
local government authority.

To achieve the above State Planning Policy outcomes the development is to:
    • avoid or minimise development impacts arising from altered stormwater quality and
        flow by providing for development and construction activities in accordance with
        acceptable design objectives
    • avoid or minimise development impacts of waste water (other than contaminated
        stormwater) on water quality objectives
    • avoid or minimise development impacts arising from the creation or expansion of
        non-tidal artificial waterways such as urban lakes




A PO Box 26, Carina Q 4152                                                                       9|P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.