Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 282, section 1. The text section number identifies this passage in the reader.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.
Specific Outcome Measures Comment
S22 Site Characteristics M22.1 An assessment of site characteristics is The stormwater management plan assesses
Site characteristics are understood undertaken that demonstrates an appropriate the proposed site uses and demonstrates an
in order to determine the approach to preventing disturbance as determined appropriate treatment train.
appropriate stormwater through assessment of the following:
management approach relevant to
a) Soil types/properties including unconsolidated
the land use, development and/ or
soils, hard setting and surface sealing soils and soils
activity.
known to, or which have the potential to be
susceptible to acidity, dispersive subsoils, salinity,
sodicity, toxicity, accelerated erosion or other
hazards;
b) Local geology as having potential for land slip,
seeps and the like;
c) Watercourses, overland flow paths, wetlands,
waterway vegetation, natural detention basins and
water bodies within or upstream/ downstream of
the site;
d) Ridge crests, drainage lines, waterlogged areas,
discharge points, flood plains and known flood
problem areas within or upstream/downstream of
the site;
e) Areas where removal of vegetation and ground
cover will likely create erosion problems or reduce
infiltration capacity
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.