Skip to the record
Beware of cheap imitations.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 283, section 1. The text section number identifies this passage in the reader.

                   Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                 SEQwater Development Guidelines
                         Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

                Specific Outcome                                   Measures                                 Comment

                                              f) Areas susceptible to wind and water erosion;

                                               g) Areas which due to the length and steepness of
                                              slopes may be prone to subsidence, mass
                                              movement or erosion; and

                                              h) Areas where the depth to water table or nature
                                              of bedrock will affect infiltration capacity, land
                                              stability, and the like.

 S23   Stormwater/Runoff Management           M23.1 Scale, location and intensity of land uses,
       Capacity                               development and activities are such that the sizing
       Development capacity is limited to a   of stormwater management measures can be
       type, amount and location for which    accommodated wholly within the site. (Note the
       likely stormwater pollutants from      ‘measures’ includes a range of features and devices
       construction and operation can be      including basins, swales, traps, buffer strips,
       captured and treated on-site           wetlands etc.)
       through best practice stormwater
                                              M23.2 Scale, location and intensity of land uses,
       quality control measures, including
                                              development and activities are such that all
       retention and detention as
                                              adverse water quality impacts can be mitigated
       appropriate to the site and the land
                                              onsite.
       use.
                                               M23.3 Land area is set aside for the appropriately
                                              sized stormwater mitigation measures.
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.