Skip to the record
Accept no imitations.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 284, section 1. The text section number identifies this passage in the reader.

                  Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                 SEQwater Development Guidelines
                         Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

                Specific Outcome                                  Measures                                           Comment

 S24   Stormwater Management                  M24.1 Stormwater management measures are              A site based stormwater management plan
       Measures                              selected, and the overall stormwater management        has been prepared by a suitably qualified
       Stormwater management measures        system designed and certified by a suitably            engineer for the development.
       for construction and operation are    qualified and experienced professional as being
       appropriate to water quality,         appropriate to the site in terms of soil type,
                                                                                                    Refer to the site based stormwater
       drainage, flooding and waterway       landform and ecological characteristics, using
                                                                                                    management plan for details of the pollutant
       corridor issues in the catchments,    results of the assessment for Specific Outcome S22,
                                                                                                    removal and management measures
       catchment areas identified in any     and recognised, locally accepted hydrological,
       Council plans/strategies, or any      hydraulic, hydrogeological, soil, water quality and
       endorsed catchment management         biological data and design methodologies.
       plan.
                                             M24.2 Designs should stipulate pollutant removal
                                             performance, maintenance requirements and
                                             responsibility for the overall stormwater
                                             management system, as well as stipulate the type,
                                             location, installation, pollutant removal
                                             performance and maintenance requirements for
                                             each stormwater management measure.

                                             M24.3 Stormwater management measures and the
                                             overall stormwater management system is
                                             designed and engineered for a range of storm
                                             events in compliance with published local or State
                                             objectives.
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.