Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 88, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          C29-C36          0.1     3.42                  <0.1      <0.1     <0.1      <0.1   <0.1    <0.1


          * Detection Limit: Estimated Quantitation Limit Results expressed in mg/l



          Results show `no detection` of hydrocarbons of all carbon fractions with the exception of Sample 2 C15-
          C28 with one sample showing` Inflow concentration of >5,000ppm.

          Independent Standard and Validation
          The Standard and the independent validation that applies to the SPEL Puraceptor™ separators provides
          the council and the authority the appropriate latitude to assess the product and the catchment design
          unencumbered by commercial partiality. Please refer to the test data in Appendix 3.


          3.4       Installation Record
          The SPEL Puraceptor is not solely a design theory but a proven record in the UK, one of the world`s most
          industrialized and urban environments, for the past 21 years in Australia. A comprehensive list of SPEL
          Puraceptor installation sites in Australia can be found in Appendix 4.




HEAD OFFICE                  POSTAL                             EMAIL                        ABN                     spel.com.au
100 Silverwater Road         PO BOX 7138                        [email protected]            83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.