SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Tewantin Admin Local Laws office
upgrade completed.
Continued use of Council’s mobility
system.
Tewantin Admin level 1 kitchen
asbestos removal and floor
replacement.
Responding to emergency after
hour’s call outs.
Supporting Pomona local
community to upgrade the memorial
rotunda.
Civil Operations
Develop a plan for addressing the long Commenced capturing tree data to Prepare a Tree Management Plan Continue to capture tree data
term impacts associated with unsuitable manage trees as assets and which incorporates management of Engage a consultant to prepare a
trees determine those that are unsuitable unsuitable trees and a replacement Tree Management Plan.
and require removal and program.
replacement.
Implement recommendations from the Refined tree processes to include Implement the Contractor Analyse current reporting to inform
Tree Maintenance Review weekly contractor reporting outlining Performance Management system preparation of the 19/20 Arborist
costs, number and size categories which has been prepared. Services budget with accurate tree
of all trees removed or maintained. forecasting.
Finalising the policy/process for planting Draft guideline prepared & peer Prepare policy & guideline. Workshop policy & guideline with
in and managing structures in the road reviewed by internal working group. Council.
reserve
Establish a Memorandum of Draft MOU document finalised. Present draft MOU to Council for Draft MOU approved by Council and
Understanding between Council & the approval. then signed by both Council CEO
Friends of Noosa Botanic Gardens and Friends of NBG President
Contribute to improved asset Repairs to Cooroy Mountain Road Biobasin maintenance consideration Ongoing participation in Asset
management outcomes facilitated through the Bridge by Executive Team. Working Groups.
Working Group
Participation in the Parks &
Playgrounds Working Group.
Page 49 of 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.