Original source · versioned page text
Town Planning Report 18 Taylor Court Cooroy Rev A (1)
Attached to the e-mail Fw_ Email 3 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 3).msg.
acceptable outcomes or performance outcomes of the code. Where the assessment summary is
reserved in relation to an assessable element the development complies with that relevant
assessment criteria and no further assessment is provided in Table 7.
Table 7 – Assessment Summary
Code Assessment
Low Impact Industry Development complies with the purpose and overall outcomes of Low
Zone Code (6.5.1) Impact Industry Zone Code to provide support for industrial activities.
Design facilitates the efficient use of land for small scale and low
impacting industry activities.
The development represents infill industrial development of a serviced
lot and is consistent with the surrounding uses. An assessment against
the benchmarks of the code is included in Appendix C.
Cooroy Local Plan The proposed development at 18 Taylor Court Cooroy supports the
Code (7.2.2) purpose and overall outcomes of the Cooroy Local Plan Code by
delivering an industry precinct that strengthens Cooroy’s role as a
hinterland jobs and services hub.
The development provides small to medium business tenancies and
represents orderly urban growth within the established industrial area
and achieves the intended balance between economic activity,
environmental protection and preservation of the Cooroy small town
character. An assessment against the benchmarks of the code is
included in Appendix D.
Regional The application proposal is for an urban industrial development
Infrastructure connected to reticulated electricity, telecommunications, sewer and
Overlay Code (8.2.9) water services and will not involve onsite wastewater or waste from
high-risk industrial activities.
Site is within The Lake Macdonald water supply catchment and
proposes to incorporate stormwater quality treatment, water sensitive
urban design and best practice waste management. The development
will operate in a manner that avoids cumulative water quality impacts
and will adopt sustainable land use practices including erosion and
sediment control with treated stormwater directed to a lawful point of
discharge.
Development complies with the purpose and overall outcomes of the
Regional Infrastructure Overlay Code and an assessment against the
benchmarks of the code is included in Appendix E.
16
Town Planning Report - 18 Taylor Court Cooroy QLD 4563
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.