Original source · versioned page text
Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
14. Renewable resources and low energy consumption principles shall provide a minimum
of 50% of the 24 Eco-cabins and Village Green Recreation Centre power, cooking and
heating needs in accordance with Overall Outcome 008d) of the Noosa North Shore
Eco-Tourism Portal Development Code.
15. All open windows of the 24 Eco-cabins and Village Green Recreation Centre shall be
screened to reduce the impact of biting insects.
16. Lot 5 Eco-cabin shall be designed to comply with AS.1428.1-2001 for wheel chair
accessibility, with all other Eco-cabins to have doors to living areas and at least 1
bedroom and bathroom a minimum of 870mm and hallways 1000mm. Walls in
downstairs bathrooms shall be strengthened for the provision of handles and handrails.
17. A minimum of one bicycle shall be provided for each Eco-cabin.
18. A network of pedestrian and bikeways shall be provided in accordance with Overall
Outcome 13a) of the Noosa North Shore Eco-Tourism Portal Development Code. A
plan of this network shall be submitted for assessment with an application for
Operational Works.
19. A fully accessible shuttle facility operating as a free service available to the general
public and servicing the development on Lot 2 RP 135678 and the Eco-cabins and
Village Green Recreation Centre shall be provided in accordance with 0013d) of the
Noosa North Shore Eco-Tourism Portal Development Code. A plan shall be provided
with the application for Operational Works detailing the shuttle bus set down area for the
East Development Zone.
20. Lots 900 and 901 shall be dedicated to Council prior to commencement of the use. All
ecological rehabilitation works shall be undertaken prior to sealing of the plan of survey
in accordance with the Noosa North Shore Eco-Tourism Portal Development Code. Lots
900 and 901 shall be jointly managed by Council and the applicant, with the trails and
access ways maintained by the applicant. Any further works/development shall be
subject to approval of Council.
21. The East Landscape Buffer Zones shall be planted prior to the commencement of the
use in accordance with Overall Outcome 0018c) of the Noosa North Shore Eco-Tourism
Portal Development Code. Detailed planting plans of this Landscape Buffer Zone shall
be submitted for assessment with an application for Operational Works.
22. Apart from emergency or service vehicles, access to the Conservation Precinct shall be
taken from the west access point for the East Development Zone, with access ways to
predominantly following existing tracks pursuant to the Noosa North Shore Eco-Tourism
Portal Development Code.
23. Security in the form of a cash bond or trading bank guarantee to the sum of $150,000
must be submitted, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
24. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to
in this approval to effect compliance with conditions.
25. The Development Permit for a material change of use of premises lapses if the use has
not happened by 23 March 2010, unless an application to extend the currency is
approved by Council.
26. The developer must obtain all of the other Development Permits referred to in the
Decision Notice, prior to obtaining a Development Permit for Building Works.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.