Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
Land Development
Vehicle Access
27. The applicant shall design the intersection on Beach Road with Road A, the entry point
for the Eco-cabins, to be in accordance with AustRoads requirements for Rural Right
Turn Lanes, Type B.
28. Vegetation clearing required for the construction of internal roadways shall be in
accordance with the Noosa North Shore Eco-Tourism Portal Stage 1 Roadworks
Clearing Photographic Record. The trees to be removed shall be marked in accordance
with the Site Works plan and a joint inspection shall occur prior to clearing commencing.
29. The applicant shall ensure consistency with OO11b) & c) of the Noosa North Shore Eco-
Tourism Portal Development Code and shall investigate the possibility of reducing
impermeable surfaces for areas such as low turnover parking areas, access driveways
etc throughout Stage 1.
30. Submit detailed drawings with the Operational W orks Application demonstrating that the
access ways, driveways and parking surfaces are designed to maintain existing
drainage patterns and avoid concentrating stormwater flows.
Parking
31. Carparking shall be provided within the site as shown on drawing number 7296/11/01-
00A prepared by Cardno Pty Ltd and dated 16/05/05, except as modified herein.
32. A minimum of 10 uncovered carpark spaces shall be provided on site in the vicinity of
the Village Green Recreation Centre, including 1 clearly defined disabled carpark space.
Traffic Management
33. The Traffic Management Plan shall be amended to ensure compliance with the Noosa
North Shore Eco-Tourism Portal Development Code OO11a) & b) for this stage of the
development.
Pedestrian Access
34. The applicant shall submit an Integrated Movement Plan showing safe pedestrian and
cycle movements in accordance with the requirements of Queensland Streets and to
demonstrate compliance with OO14 of the Noosa North Shore Eco-Tourism Portal
Development Code. It is envisaged that this plan shall be incorporated into an amended
Traffic Management Plan and may involve an off-road pathway.
Sewer Infrastructure
35. The sewage treatment plant and disposal area shall be in accordance with the
requirements of the Noosa North Shore Eco-Tourism Portal Development Code and an
approved Sewage Treatment Site-Based Management Plan and Effluent Irrigation Plan.
If the sewage treatment plant is located off-site it shall comply with the following:
35.1. An amended Revised Infrastructure Report (as referenced in Section 6.6 of the
Noosa North Shore Eco-Tourism Portal Development Code) shall be submitted
detailing the new proposed sewage system;
35.2. The applicant shall enter into an Enduring Legal Agreement with Council that
stipulates the following:
35.2.1. The owners of the properties are responsible for the operations and
maintenance of all private infrastructure in Council’s road reserve
35.2.2. Indemnifies Council in respect to any legal action taken as a
consequence of the infrastructure being located in Council’s road reserve
and