Original source · versioned page text
2016-02-02 I&S Committee - Item 4 - Attachment 1 - Noosa Traffic Study
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
3.6 Year 2015 capacity analysis – Cooroy Capacity analysis under existing conditions indicates degrees of saturation (DOS) at strategic intersections within the Cooroy area at peak times as depicted in Figure 11. Figure 11: Year 2015 AM and PM peak hour Degrees of Saturation at Cooroy The critical traffic related issues in this part of the network are: (i) Myall St / Elm St intersection (ii) Diamond St / Elm St intersection The Myall St / Elm St intersection is operating way over capacity. The only way this intersection conveys the volume of traffic that it does from Myall St (south) into Elm St (east) is due to the low speed environment and the courtesy of other drivers using the intersection. This intersection is part of the State-controlled road network and negotiations have commenced with DTMR in relation to its upgrading. The Diamond St / Elm St intersection is almost at absolute capacity, with there being issues turning right from Diamond St into Elm St (north) in the afternoon peak. This intersection is also part of the State-controlled road network and negotiations have commenced with DTMR in relation to its upgrading. 14.s.53.7 Page - 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.