- The existing waterway area is not utilised by the downstream property owner for
either rural/agricultural or residential purposes. No nuisance or loss of enjoyment
will result from proposed development works.
Refer to the Flood Maps in Appendix D for details of the overland flow path flooding
extents during the major (1% AEP) storm events for the pre and post developed scenarios.
5.2 Peak Flow Management
The proposed development will result in a minor increase to the impervious area within
the development site. Allowing for an impervious area of 1,000m2 per lot (house, shed
and access driveways) plus 3268m2 of road and nominated access driveways, the
impervious area within the development site will increase to 12,268m2. This equates to a
fraction impervious of 0.06 or 6% of the site area.
These impervious areas are disconnected from the flow paths and neighbouring
properties, meaning runoff from the impervious areas will pass over pervious areas
allowing further infiltration before reaching the site boundaries and flow path. This will
help mitigate impacts external to the site.
Table 5.2-1 Shows the central flow path catchment characteristics and breakdown.
8
Document Set ID: 23448644
Version: 1, Version Date: 13/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.