4. Provide detail demonstrating the available sight distances about the Hoy Road/Site
Access intersection. The detail must be prepared by a suitably qualified person (RPEQ)
and include, but not be limited to:
a. longitudinal sections demonstrating that 123 metres of unbroken sight distance is
available in both directions;
b. a layout plan demonstrating that 123 metres of unbroken sight distance is available
in both directions; and
c. detail of any existing vegetation that must be removed (or maintained) to achieve
the minimum sight distances.
Issue – Sight Distance for External Intersection
Section 4.4.5 of MODUS’ Traffic Engineering Report (MOD23498QLD, Rev. B) dated 8
January 2025 states that the required 157 metres of sight distance is only available to the right
(north) about the Lake MacDonald/Hoy Road intersection in accordance with Austroads.
No detail has been provided demonstrating that an unbroken 157 metres of sight distance is
available to the right (north) both longitudinally and in ‘plan view’.
No detail has been provided demonstrating the available sight distance to the left (south), both
longitudinally and in ‘plan view’, and the extent of works required to achieve compliant sight
distances.
Information Required
5. Provide detail demonstrating the available sight distances about the Lake
MacDonald/Hoy Road intersection. The detail must be prepared by a suitably qualified
person (RPEQ) and include, but not be limited to:
a. a layout plan and longitudinal sections demonstrating that 157 metres of unbroken
sight distance is available to the right (north);
b. a layout plan and longitudinal sections demonstrating the available unbroken sight
distance to the left (south); and
c. the extent of works required to achieve compliant sight distances to the left (south).
Issue – Powerline Relocation
IPS’ Plan of Development (682-DA-001, Rev. A) dated 7 January 2025 proposes to potentially
realign the existing overhead power lines.
In accordance with Performance Outcome 12 of the Reconfiguring a Lot Code, each lot is to
be provided with power supply and telecommunications.
Information Required
6. Provide additional detail demonstrating the proposed realignment of existing power. The
additional detail must be prepared by a suitably qualified person and be accompanied
by a “Letter of Support” or similar by the relevant service provider.
Issue – Water Reticulation
Walsh Consulting Engineers’ Overall Layout Plan and Earthworks Extents (SK02, Rev. A)
dated 7 January 2025 proposes to install new 100mm dia. water mains to service the proposed
lots and provide a future connection to the east of the proposed internal intersection.
Information Required
Page 3 of 5
Document Set ID: 23690726
23524744
Version: 1,
2, Version Date: 15/04/2025
07/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.