Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

2009 KHA Original Report · REC14/0015

Attached to the e-mail REC14/0015 Report, Previous IR response, Plans and owner's consent Email 2 of 3.

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

KHA Development Managers

May 2009

 

Specific Outcomes

1) incorporates on-road cycling
facilities.

‘Cities fitters

 

carriageway width, as a traffic
calming measure to encourage
lower traffic speeds. (Note:
Carriageway widths are identified in
Section 2.3 of PSPS Engineering Design
Standards — Roads, Drainage and
Earthworks.)
AND
§8.7 On-road cycling treatment is
utilised to provide safe and
continuous movement of cyclists
along a roadway such as--
a) sealed shoulders;
b) wide kerbside lane;
c) exctusive or peak period bicycie
lane;
d) advisory treatments such as
Bicycle Awareness Zone;
e) shared parking / bicycle lane;
f) contra flow bicycle lane; or
g) bus/bicycle lane;
ANDO
$7.8 The provision of bicycle lanes
at intersections is generally in
accordance with AUSTROADS Part
14, section 5 and Manual of Uniform
Traffic Control Devices (MUTCD)
Part 9.

of this application.

N/A
No new roads are proposed as part
of this application.

N/A
No new roads are proposed as part
of this application.

 

 

O8 The development contains a

pathway system that encourages

walking and cycling and provides a
safe environment for users, and is--
a) a stable, smooth surface,
including acrass driveways, sections
and joins;

b) easily maintained;

c) of a width and longitudinal
gradient to cater for projected
usage

d) inclusive of clear sight-lines for
safe use;

e) be free of any obstructions such
as fences, signage and bollards.

$8.1 Subdivision design and layout
provides for walking and cycling
“routes designed and constructed in
accordance with—

a) Sections 2 and 3 of PSPS
Engineering Design Standards —
Roads, Drainage and Earthworks;
b) AUSTROADS Parts 13 and 14;
and

c) The Noosa Cycling and Walking
Network Development Plan;

AND

$8.2 If within 1km of the Pathways
Network identified on Map 2 of
Schedule 5, the subdivision design
and layout includes pathways—

a) located in accordance with the
Pathways Network identified on Map
2 of Schedule 5; or

b) linking to the Pathways Network
identified on Map 2 of Schedule
538;

AND

$8.3 Pedestrian routes are planned
to provide clear, safe connections

N/A
No new roads are proposed as part
“Of this application. ~~

 

 

between residential, open space,

 

 

Town Planning Report
Reconfiguration of a Lat
Eumundi Noosa Road, Noosaville

Page 18 of 31

 

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2009 KHA Original Report.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.