Appendix C - Code Assessment
Attached to the e-mail Reconfigure a Lot (1 Lot into 4 Lots) - RAL17/0511.
Reconfiguring a Lot Code
(including the amenity of the local area) in the carrying existing high voltage lines; or
short and long term; and c) no extensions to the existing reticulation
f) ensures that the existing systems are upgraded network is necessary; or
or relocated to be capable of supporting the d) it is necessary to cross a body of water;
proposed development; AND
S16.3 Street lighting is provided in accordance
with Section 3.19 of PSP5 Engineering Design S16.3 – Not Applicable
Standards – Roads, Drainage and Earthworks; Street lighting is not present along church street.
AND
S16.4 For lots not within a sewerage service area - S16.4 – Not Applicable
the lot has sufficient area and other attributes to
ensure sustainable on-site sewerage disposal
O17 Essential network infrastructure (e.g. S17.1 Components of the essential network
electricity, water supply, sewerage and infrastructure that are likely to fail or may result in S17.1– Complies
telecommunications) maintains effective function contamination when inundated by flood water— Infrastructure will be designed to avoid water
during and immediately after flood events. a) comply with Table 13.12; or inundation.
b) are designed and constructed to exclude
water inundation or infiltration and resist
hydrostatic and hydrodynamic forces as a result of
inundation.
Electricity supply infrastructure S18.1 Building footprints are situated clear of any S18.1 – Complies
O18 Uses and works maintain a safe distance power easements on-site; There are no easements located on the property.
from electrical infrastructure including substations, AND
overhead power lines, power poles and S18.2 Building footprints are not less than 50m
transformers. from an existing fenced electricity substation. S18.2 – Complies
There are no substation in proximity to the site.
14.190 Earthworks and stormwater management
O19 Storm water run-off is managed so as not to No solution provided O19 – Complies
cause any adverse impacts on the built or natural The proposal will manage storm water run-off to
environment including changes in quality, quantity