Appendix C - Code Assessment
Attached to the e-mail Reconfigure a Lot (1 Lot into 4 Lots) - RAL17/0511.
Reconfiguring a Lot Code
or location of stormwater discharges. ensure no adverse impacts will occur.
O20 Filling or excavation only occurs where it No prescribed solution. O20 – Complies
does not adversely impact on— Any earthwork will not impact on the watercourses
a) watercourses, drainage lines and wetlands; or and drainage lines occurring through the property
b) vegetation on land identified on Biodiversity
or water levels elsewhere.
Overlay Maps OM1.1-OM9.1; or
c) water levels on properties elsewhere.
14.191 Landscaping and visual amenity
O21 Land development responds to the distinctive S21.1 The natural landform and landscape are not O21 – Specific Outcome
landscape character of the site by utilising the modified to accommodate the development. The proposal will require some modification to the
natural features of the site, which include— drainage lines occurring through the property to
a) watercourses and drainage lines;
allow for access and house site areas. The
b) significant trees;
c) understorey vegetation; drainage lines will generally remain intact and
d) rock outcrops; and these will be rehabilitated upon completion of the
e) views. subdivision.
O22 Native vegetation, including individual mature S22.1 Buffers of existing native vegetation around S22.1 – Complies
trees are retained, protected, maintained and site boundaries and environmentally sensitive The site does not contain any vegetation identified
supplemented, with particular consideration given areas are retained and reinforced through to be of significance. There predominantly weed
to— additional planting;
species including pine trees along the streams.
a) roadsides; AND
b) the amenity of adjoining land uses; and S22.2 For reconfiguring in the Rural Zone and
c) the protection of environmentally sensitive Rural Settlement Zone— S22.2 – Not applicable
areas. a) a 10m landscaped buffer area is provided along
road frontages;
b) clearing and disturbance to vegetation is
minimised around road works, laying of services
and utilities and construction of property
entrances;
c) re-vegetation of disturbed areas occurs after
completion of works; and