8. Submit a copy of the approved plans that are issued “For Construction” and duly signed by
the consultant Registered Professional Engineer of Queensland (RPEQ). Plans must be
submitted and approved by Council prior to the pre-start meeting.
9. Submit certificates demonstrating currency of public liability insurance and works insurance
covering the works. Certificates must be submitted to Council prior to the pre-start meeting.
10. Submit a condition report documenting any existing defects in the road reserve or
infrastructure, including photographs of the site frontage. The report must be submitted to
Council prior to the pre-start meeting.
11. Submit a Construction Management Plan to Council prior to the pre-start meeting. The
Construction Management Plan must specifically address the following:
a. traffic management during all aspects of the construct phase including:
i. a Traffic Management Plan in accordance with Manual of Uniform Traffic Control
Devices (MUTCD) detailing all temporary signage and traffic control measures
prior to construction;
ii. maintenance of safe vehicle and pedestrian access across the frontage of the
site both during daily construction and after daily construction has ceased;
iii. proposed fencing to the site during the construction phase of the development;
iv. adequate parking arrangements for construction workers and deliveries; and
v. no queuing of trucks is permitted on residential streets;
b. maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
c. works programme identifying key components of the works and their respective
durations;
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues;
e. include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details;
f. include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details;
g. identification of complaint management procedures including:
i. contact details for the on-site manager; and
ii. dispute resolution procedures.
h. details on the location of external fill/dump sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage.
Any damage to the existing road system as a result of haulage operations shall be fully
repaired at the applicant’s expense.
12. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
13. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
14. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Page 10 of 17
Document Set ID: 25035493
Version: 2, Version Date: 07/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Delegated Report - Code - Planning OPW26 0069 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.