                        f.      All necessary stormwater drainage control measures must be provided so as not
                                to concentrate stormwater runoff or cause erosion on adjoining lands.
                 20.    Pavement design for privately owned works within the road reserve must be undertaken
                        in accordance with the relevant standards and must be certified by an RPEQ.
                 21.    All pavements within the road reserve must have a slip resistant surface.
                        Stormwater Drainage
                 22.    The stormwater drainage from the development must be carried out in accordance with
                        the approved engineering plans listed in this permit and must include/address but is not
                        limited to the following:
                        a.      Stormwater runoff from the site due to the development must be discharged from
                                site in accordance with the relevant requirements of Queensland Urban Drainage
                                Manual (QUDM) with a particular attention at preventing concentrated stormwater
                                discharge onto the adjoining park land;
                        b.      The stormwater works must be supervised by suitably qualified RPEQ who
                                certifies that the completed works are in compliance with this permit, the applicable
                                standards and best engineering practices; and
                        c.      All stormwater structures must be contained entirely within the subject site unless
                                written permission from the respective landowner(s) is provided to Council.
                 23.    The development works must not to cause additional ponding of water on any adjoining
                        lands or concentrate or direct overland flow to an adjoining property.
                        Geotechnical Stability, Earthworks and Retaining Walls
                 24.    Earthworks and retaining works carried out on site must not affect the structural integrity
                        of any of the buildings, lands, vegetation, structures and/or utilities services on adjoining
                        properties. Existing dividing fences that are affected by the works must be replaced
                        prior to the Building Certifier issuing the Certificate of Classification.
                 25.    All earthworks and retaining works must be undertaken generally in accordance with the
                        approved plans listed in this permit and must be in compliance with the provisions of
                        Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential
                        and Developments; and must be designed, supervised and certified by suitably qualified
                        experienced RPEQ.
                 26.    All retaining walls must be designed and constructed in accordance with the applicable
                        standards and guidelines, and must be certified by an RPEQ where exceeding 1.0m in
                        height. All retaining walls that can be accessible public and exceed 1.0m in height must
                        be provided with appropriate fall barrier or safety fence.
                 27.    All earthworks, associated batters and retaining structures (both above ground and
                        below ground) must be contained entirely within the subject site.
                 28.    The construction works of the proposed retaining wall along the property boundaries
                        must minimise the potential of adverse impact on the survival of the existing trees and
                        natural vegetation on the adjoining lands and must be in compliance with the
                        Landscaping conditions of this permit.
                 29.    Prior to the Building Certifier issuing the Certificate of Classification, a certification by
                        RPEQ must be submitted to Council which certifies that the development has been
                        constructed in accordance with the conditions of this permit, best engineering practices
                        and the applicable standards.




                                                                                                             Page 5 of 8
Document Set ID: 22383616
Version: 3, Version Date: 27/04/2023

Used in these records

About this file

File size
148 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referral Agency Response - Minor Change - RAP20 0003 01 [As Published].pdf · 148 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.