f. All necessary stormwater drainage control measures must be provided so as not
to concentrate stormwater runoff or cause erosion on adjoining lands.
20. Pavement design for privately owned works within the road reserve must be undertaken
in accordance with the relevant standards and must be certified by an RPEQ.
21. All pavements within the road reserve must have a slip resistant surface.
Stormwater Drainage
22. The stormwater drainage from the development must be carried out in accordance with
the approved engineering plans listed in this permit and must include/address but is not
limited to the following:
a. Stormwater runoff from the site due to the development must be discharged from
site in accordance with the relevant requirements of Queensland Urban Drainage
Manual (QUDM) with a particular attention at preventing concentrated stormwater
discharge onto the adjoining park land;
b. The stormwater works must be supervised by suitably qualified RPEQ who
certifies that the completed works are in compliance with this permit, the applicable
standards and best engineering practices; and
c. All stormwater structures must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
23. The development works must not to cause additional ponding of water on any adjoining
lands or concentrate or direct overland flow to an adjoining property.
Geotechnical Stability, Earthworks and Retaining Walls
24. Earthworks and retaining works carried out on site must not affect the structural integrity
of any of the buildings, lands, vegetation, structures and/or utilities services on adjoining
properties. Existing dividing fences that are affected by the works must be replaced
prior to the Building Certifier issuing the Certificate of Classification.
25. All earthworks and retaining works must be undertaken generally in accordance with the
approved plans listed in this permit and must be in compliance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential
and Developments; and must be designed, supervised and certified by suitably qualified
experienced RPEQ.
26. All retaining walls must be designed and constructed in accordance with the applicable
standards and guidelines, and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that can be accessible public and exceed 1.0m in height must
be provided with appropriate fall barrier or safety fence.
27. All earthworks, associated batters and retaining structures (both above ground and
below ground) must be contained entirely within the subject site.
28. The construction works of the proposed retaining wall along the property boundaries
must minimise the potential of adverse impact on the survival of the existing trees and
natural vegetation on the adjoining lands and must be in compliance with the
Landscaping conditions of this permit.
29. Prior to the Building Certifier issuing the Certificate of Classification, a certification by
RPEQ must be submitted to Council which certifies that the development has been
constructed in accordance with the conditions of this permit, best engineering practices
and the applicable standards.
Page 5 of 8
Document Set ID: 22383616
Version: 3, Version Date: 27/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Minor Change - RAP20 0003 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.