Erosion and Sediment Control
30. Sediment and erosion control measures must be in place prior to works commencing
and for the duration of construction. The site Supervising Engineer is responsible for
ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with
"best practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in
the projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events,
d. Achieve the desired environmental outcomes, and
e. Are maintained until site stabilisation has been established.
Council may request further controls to be installed should the implemented measures
be found inefficient.
31. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and
prior to rainfall occurring.
32. Sediment must not leave the site or enter onto adjoining properties or Council’s drainage
system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to
implement appropriate approved erosion and sediment control measures throughout the
site during all phases of construction including vehicle shakedown pad/grid (or similar)
at the access to the construction site. Where sediments or other contaminants are
deposited on a road, they must be removed so as not to enter Council’s drainage system
or waterways.
33. Prior to the completion of the development and commencement of use, all site surfaces
must be effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the medium to
long-term. For the purpose of this condition, an effectively stabilised surface is defined
as one that does not, or is not likely to result in visible evidence of soil loss caused by
sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
34. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
4. REASONS FOR INCLUSION OF CONDITIONS
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Page 6 of 8
Document Set ID: 22383616
Version: 3, Version Date: 27/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Minor Change - RAP20 0003 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.