Council archive · source document
Appendix 5- Response to Planning Scheme Codes · MCU17/0027
Attached to the e-mail Engineering plans, Landscape Plan and Response to Code (Email 2 of 2) MCU17/0027 & OPW17/0119.
users; ii. conveys road
pavement run-off to
stormwater drainage in a
manner that allows the road
to be trafficable in Q100 ARI
local rainfall events; and d)
verges and footpaths
provide— i. safe access for
pedestrians and cyclists
clear of obstructions; ii. an
access area for vehicles
onto properties; iii. a
corridor allocated for
services and utilities; and
iv. additional amenity for
minor roads.
O8 Stormwater drainage S8.1 Stormwater drainage planning, Complies
infrastructure is planned, design and construction is in accordance The stormwater onsite will flow into
designed and constructed with Section 4 of PSP5 Engineering the existing field inlets which are
to— a) be accessible, cost Design Standards – Roads, Drainage
located at the rear of the subject
effective and easily and Earthworks; AND
maintainable; b) protect site. Stormwater drainage
downstream capacity; c) planning, design and construction
protect downstream water is in accordance with Section 4 of
quality; d) maximise on-site PSP5 Engineering Design
stormwater retention and Standards – Roads, Drainage and
retardation; and e) convey Earthwork.
run-off to stormwater
drainage in a manner that S8.2 As Constructed data is submitted in
allows roads to be accordance with Section 6 of PSP5 Complies
trafficable in Q100 ARI local Engineering Design Standards – Roads,
rainfall events. Drainage and Earthworks; AND S8.3
Stormwater drainage planning, design
and construction is in accordance with
the Queensland Urban Drainage Design
Manual.
O9 Roads and stormwater S9.1 Roads and stormwater drainage Complies
drainage infrastructure is infrastructure is constructed in
constructed— a) in accordance with— a) Sections 2, 3 and 4
accordance with of PSP5 Engineering Design Standards –
appropriate engineering Roads, Drainage and Earthworks; b)
standards; and b) to Queensland Design Code for Residential
minimise adverse Streets; c) AUSTROADS; or d) A
environmental impacts, combination of the principles in these
including from run-off and documents;
erosion Complies
AND S9.2 Erosion and sediment control Erosion and sediment control
measures are designed and implemented
measures are designed and
in accordance with the Institution of
Engineers Australia (Queensland implemented in accordance with
Division) Soil Erosion and Sediment the Institution of Engineers
Control - Guidelines for Queensland Australia (Queensland Division)
Construction Sites. Soil Erosion and Sediment Control
- Guidelines for Queensland
Construction Sites.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5- Response to Planning Scheme Codes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.