Appendix 5- Response to Planning Scheme Codes · MCU17/0027
Attached to the e-mail Engineering plans, Landscape Plan and Response to Code (Email 2 of 2) MCU17/0027 & OPW17/0119.
Environmental Protection S10.1 Roads and stormwater drainage Not Applicable
O10 Roads and stormwater follow the edge of existing disturbed
drainage infrastructure are areas, or alternatively, these works are
located and aligned so as co-located within a combined utility
to— corridor; AND
a) minimise disturbance to S10.2 Roads avoid native vegetation and Not Applicable
native vegetation and/or provide for fauna underpasses and
other habitat areas; b) associated fencing where appropriate;
protect and maintain wildlife AND
corridor movements and the S10.3 Road infrastructure within or Not Applicable
safety of native fauna; c) adjacent to native habitat incorporates
minimise changes to the fences which allow for protected wildlife
hydrological regime, movement and controls unrestricted
including drainage patterns, access of domestic cats and dogs; AND
run-off and water quality; d) S10.4 Native vegetation is protected from Complies
avoid crossing clearing or construction activities by— a)
watercourses, drainage clearly marking vegetation to be retained
lines and wetlands, but with flagging tap; b) installing protective
where such crossings are fencing around the dripline of vegetation;
unavoidable, disturbed and c) ensuring stock piling, storage and
areas are reinstated and vehicle parking occur outside the areas of
revegetated on completion vegetation to be retained; AND
of works; and e) minimise S10.5 Low impact construction Complies
bulk earthworks. techniques are used around areas of
vegetation to be retained to minimise
interference with the vegetation.
O11 Roads and stormwater No solution provided. Not Applicable
drainage infrastructure is
proven to be suitable for its
use prior to Council
accepting the dedicated
asset.
O12 Alignment of S12.1 The location, design and Not Applicable
stormwater drainage construction of stormwater drainage The proposed development will
infrastructure is to allow for structures is in accordance with Sections utilise the existing stormwater
easy access for the ongoing 4 and 5 of PSP5, Engineering Design
infrastructure (field inlets) which
maintenance by Council. Standards - Roads, Drainage and
Earthworks; AND are identified at the rear of the
subject site.
S12.2 Where infrastructure is located on Not Applicable
private land an easement is dedicated The proposed development will
over the infrastructure in accordance with utilise the existing stormwater
Section 4 of PSP 5, Engineering Design
infrastructure (field inlets) which
Standards – Roads, Drainage and
Earthworks are identified at the rear of the
subject site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5- Response to Planning Scheme Codes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.