Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Unit Bullding. Sunshine Beach Geatechnical Investigations Site Classification The site has been classified for footing design purposes as Class P as defined in AS2870-1996. This classification is due to the low bearing capacity in the upper soils over part of the site. Footings should be designed using engineering principles and the data from this report. Footing System The footing system adopted will depend on the geometry of the structure on the site, the nature and distribution of loads and the costs. It is likely that the structure could be Partially on a high level stiffened raft and partially on a piled footing. Alternatively, the loose soils may be excavated and recompacted. if recompacted under specified controlled conditions as et out in AS3798-2007, the soils may be regarded as controlled engineered fill and can be used to support the footing system. Where a combined footing is proposed, the stiffened raft footing system should be designed as an equivalent Class M raft as per AS2870 to allow for some differential movement between the piled and slab on ground components. Pile foundations typically fall into two categories, namely displacement piles and non-displacement piles. Displacement piles are those pile types that displace the soil surrounding the pile during installation, thus effectively improving the ground conditions. Non-displacement piles are those that are bored into the ground without effectively displacing soil materials, and therefore no improvement i is obtained from the in situ ground conditions. Examples of non-displacement piles are open bored piles or continuous-flight auger CFA piles. Screw piers are also a non-displacement type. Of the pile types indicated above, the displacement piles, CFA piles and screw piers have an advantage of not requiring pile hole support during construction. Open bored piles may require temporary or permanent casing to reduce the risk of collapse within the boreholes. Alternate piling types and their assessed advantages and disadvantages are shown in Table 1 below. Your piling contractor can provide details of the third piling option, the use of screw piers. Table 5: Piles Types and Assessed Advantages and Disadvantages Pile Type Advantages Disadvantages Bored Piles. Likely feast expensive option. Additional cost of spoil removal. Non-displacement Typically lower values of end bearing and lype Relatively widely available and understood shaft adhesion compared to displacement piles, due to mode of installation and lower confidence in pile performance. Water inflows and consequent wall stability may complicate construction. construction technology. Driven Pre-Cast Concrete Piles. High level of performance confidence. Relatively high noise and vibration during Increased design strength parameters due to installation may affect nearby developments ‘ i Would require dilapidation studies for Disp racement displacement type. adjacent structures and vibration monitaring typ No spoil removal issues. during construction. Splice joints may be required depending on depth, increasing cost. Coffey Geotechnics 3 GEOTKPAR1334AA/A 22 January 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.