Negotiated Decision Notice MCU22 0051
d. Provision of 1 street tree within the road reserve for every 8 metres of road frontage
(excluding driveways).
e. Landscape or architectural treatments that soften the appearance of the retaining
walls and industrial building along the northern boundary.
16. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
FAUNA MANAGEMENT
17. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
Works approval.
*(Refer to Advisory Note)
WASTE MANAGEMENT
18. A waste storage area must be designed and maintained in accordance with Planning
Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
The waste storage area must be:
a. imperviously paved and correctly sized for all refuse and recycling containers;
b. bunded and graded so that wastewater and bin leakage drain to the sewer;
c. provided with a conveniently located hosecock and backflow prevention device,
connected to a water supply to service the area; and
d. roofed or otherwise covered.
19. A Waste Management Plan must be prepared that details the type and quantity of waste
material that is likely to be generated by the development; where and how the waste will be
stored, disposed of and procedures for handling the waste. The Waste Management Plan
must be submitted and approved by Council prior to the issue of a Development Permit for
Operational Works.
PERFORMANCE BOND
20. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on completion of the development subject to satisfactory
performance of the conditions of approval at that time less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call upon the
bond or guaranteed sum to effect compliance with conditions.
ACID SULFATE SOIL
21 The disturbance and release of Acid Sulphate Soils must be avoided by:
a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
National Acid Sulfate Soils Guidance.
b. not excavating or otherwise removing soil or sediment containing ASS;
c. not permanently or temporarily extracting groundwater that results in the aeration of
previously saturated ASS; and
d. not undertaking filling on land at or below 5 metres AHD that results in:-
i. actual ASS being moved below the water table; or previously saturated ASS
being aerated.
Page 4 of 10
Document Set ID: 23023774
Version: 5, Version Date: 22/05/2024