Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
S2.7 A network of local streets focused towards an activity centre or Not applicable
school is provided for safe and efficient pedestrian and bike access to
the school, safe conditions for school buses, setdown facilities, with on-
site parking where practical; AND
S2.8 Passive surveillance is maximised by designing streets to enable Not applicable
development to front all streets and roads, including arterials; AND
S2.9 Streets near Public Passenger Transport facilities are orientated to Not applicable
optimise the walkable catchments within 800 metres walking distance;
AND
S2.10 The street network has no more than 15 percent of lots fronting Not applicable
cul-de-sacs. The maximum cul-de-sac length is 120 m; AND
S2.11 Street stubs to adjacent future development areas are provided at Not applicable
spacings of 200 m or closer to enable future street connections to be
made; AND
S2.12 Street block lengths are not more than 240 m long, and Not applicable
predominantly around 150-180 m long. Street block lengths are
generally shorter closer to town and neighbourhood centres; AND
S2.13 Direct, safe and attractive pedestrian and cycle routes are There are facilities provided within the
provided within and through the development and connect to bus development site to facilitate safe pedestrian
stops. movement.
S3.1 Higher density development is concentrated along public transport Not applicable
O3 Development is designed – Routes; AND
a) To encourage travel by community transport, walking and
S3.2 There is provision for bus routes through development sites; AND Not applicable
cycling rather than by private car; and
b) To maximise accessibility via existing and planned S3.3 Bus routes are located to maximise patronage catchment and to Not applicable
community transport facilities consider personal safety, lighting and traffic management; AND
page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.