Original source · versioned page text
MCU14/0056 - Attachment K -Traffic Impact Assessment
Very large file: it may take a few minutes
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
S3.14 Suitable car restraint measures are adopted within the The nature of the development layout would
development such as lower speed limits or traffic calming ensure low vehicle speeds
measures to support greater pedestrian and cycle movement; AND
S3.15 Traffic management devices on potential bus routes are provided Not applicable
in accordance with the Self-assessable code for undertaking road works
on local government roads, under the Transport Planning and
Coordination Regulation 2005; AND
S3.16 Streets identified as potential bus routes are— Not applicable
a) collector streets and sub-arterial/arterial roads which provide highly
accessible and relatively direct routes wherever practical;
b) those that provide for the shortest and most direct route for an
efficient public transport service; and
c) those that can efficiently service adjoining development areas.
No solution provided. Development access does not adversely
O4 Development access does not compromise the functions impact on the safety, capacity and operations
of particular roads as indicated in the road hierarchy, and of the road system.
does not adversely impact on the safety, capacity and
operations of the road system.
14.146 Pedestrian and Cycle Path Infrastructure
S5.1 Consideration is given to existing and future pathway linkages and Not applicable – no pedestrian or cycle path
O5 Pedestrian and cycle path infrastructure is provided – pathways link to the Local and Regional Cycle Network and to the infrastructure is proposed.
a) to form an integrated component of the movement Priority Infrastructure Plan in Part 15.
network and the open space system;
b) to encourage walking and cycling;
S5.2 Direct and accessible linkages are provided into the site. The development has linkages to the
c) to add variety and visual interest;
d) to conserve street trees, vegetation and other significant adjoining residential area to the north.
features;
S5.3 Pathway and landscape works are provided to a high standard to Not applicable – no cycle paths are proposed
page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.