Original source · versioned page text
MCU -Cooroy
Noosa Council documents MCU15/0111 69. The owner of the development is responsible for all costs associated with the construction and ongoing maintenance and repair of the treatment of stormwater on the site and for all catchments that enter the site. 70. The Operational Works Application must include calculations in accordance with the Queensland Urban Drainage Manual to demonstrate that the confluence of stormwater at the drainage easement will not cause scour and that any required dissipater/erosion control can be contained wholly within the applicant's property. 71. Any waters captured on site must be plumbed to be available for all external uses including gardening, irrigation, filling swimming pools and outdoor cleaning, as well as all ground floor toilet cisterns and washing machine cold taps. 72. Operational Works Application must demonstrate that the peak 1-year ARI event discharge off site is limited to the pre-development peak 1-year ARI event discharge flow. 73. Prior to commencement of use, the applicant must provide Council with a performance bond to the value of 150% of the value of monitoring and maintenance of the water bodies for the first 5 years of full operation. The bonds shall be incrementally released annually following completion of the development and upon demonstration to the satisfaction of Council Officers that all aspects of the approved version of the detailed Stormwater Management Construction and Maintenance Plan required by this approval have been implemented to effectively prevent or reduce likelihood of cyanobacteria outbreaks for the site for the preceding year. Water & Sewer Connections 74. Anunderground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor—Retailer Authority (Unitywater). 75. A Certificate of Completion from the Northern SEQ Distributor—Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. Power Supply 76. An underground electricity service shall be provided to the site if not already provided. In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with Council's Manager - Works Support to prepare detailed designs of the electrical proposal. The detailed designs shall then be submitted to ENERGEX for approval and a copy of their approval submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of Survey. Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at the applicant's expense and shall not entail a financial encumbrance on future purchasers of the proposed lots. Page 11 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU -Cooroy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.