Attachment B - Construction Methodology KANE

of 19

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                  HOFFMAN DRIVE MEDICAL CENTRE
                                                                                 BASEMENT AND RETENTION WORKS



3.          SITE ESTABLISHMENT
A detailed Site Establishment Plan for this phase of works can be found attached in Appendix B of this document.
In preparing the Site Establishment Plan, the following project specific requirements and risks have been taken
into consideration:

Details provided throughout the section of the report will be confirmed on completion of detailed design
documentation.

 PROJECT               SPECIFIC        PROPOSED RESPONSE                        CMP ADDRESSES
 RISK/REQUIREMENT
 Tight, site with limited space        The proposed works methodology           Y
 available onsite                      considers the limited space available    Refer Site Management Plan
                                       around the site and ensure that works
                                       can be completed within the site
                                       boundary, with minimal impact to
                                       existing access easements and
                                       neighbours

 Site Amenities Establishment          Temporary site offices are proposed      Y
                                       within the site boundary.                Refer Site Management Plan

                                       These amenities will be appropriate to
                                       sustain the proposed workforce
                                       during the Basement and Retention
                                       works.

 Traffic Management                    Prior to commencement of works           Y
                                       detailed Traffic Management plans        Refer Site Management Plan
                                       will be prepared and submitted for
                                       approval.

                                       The indicative approach during each
                                       phase of the works is outlined within
                                       this document.


DILAPIDATION REPORT
Prior to any mobilisation, Kane will undertake a photographic survey and report indicating condition of surrounding
premises, roads, footpaths, trees and utilities.


SITE FENCING
The site fence shall be erected around the boundary of the site; the temporary site fence shall be constructed
1.8m in height and shall be constructed using site temporary fencing or hoardings in accordance with WH&S
regulations.

Construction access gates for both vehicles and pedestrians will also be constructed in accordance with
the site plans provided in Appendix b.




SITE ESTABLISHMENT                                                                                    PAGE 5 OF 13
Log in to download the original file

Attachment B - Construction Methodology KANE.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.