Attachment B - Construction Methodology KANE
HOFFMAN DRIVE MEDICAL CENTRE
BASEMENT AND RETENTION WORKS
3.1 ENVIRONMENTAL CONTROLS
All Kane projects require the development of a project specific Environmental Management Plan. This plan will
be developed with consideration to the site specific requirements and to ensure the project complies with EPA
guidelines and council bylaws. The project’s exposure to weather during demolition and construction emphasises
the need for rigorous management, specifically relating to water run-off and storm water control. Please note
some of the key risks and controls proposed for this project:
ENVIRONMENTAL RISKS AND CONTROL
RISK SOURCE CONTROL
Noise Plant Plant /machinery maintained in accordance with manufacturer
Machinery recommendations.
Construction Silencers placed on large compressors / generators.
methods Comply with council work hours.
Radios Limit volume of radios.
Dust Ground Protect areas of vegetation and minimise clearing / disturbance.
disturbance Cover exposed ground with mulch or other suitable material.
Vehicle Restrict vehicle movements.
movement Dampen surfaces.
Dry powdery Landscape and re-vegetate as soon as possible.
soils Seed or cover soil stockpiles.
Waste Demolition Utilise separate recycle bins for paper, steel etc (space permitting
Construction onsite).
works Use bin contractors who sort and recycle construction waste.
Packaging Recycle demolished materials wherever possible.
Office Place lids on domestic waste bins for odour and vermin control.
amenities
Chemicals Fuel No bulk storage of fuel / oil onsite.
Oil Paints, adhesives stored on site at minimum quantities in vented
Paint containers/rooms.
Adhesives All storage of chemicals shall comply with the Material Safety Data
Sheet..
Major servicing of plant e.g. where large quantities of oil requires
changing shall be undertaken off site.
Contamination Paint Use paint wash trough. Settled solids should be removed by an
(from slurry / Concrete appropriate waste disposal company.
wash water) cutting Designate a washing up and stone cutting area away from
and soil Paver cutting stormwater drains. Build an earth bund to contain wash water from
contamination Stone cutting concrete, stone cutting.
Erosion and Disturbed / Protect and maintain natural vegetation and minimise clearing /
sediment cleared soils, disturbance as much as possible.
control rain events Connect downpipes to stormwater drainage as soon as possible or
pipe roof water onto grassed areas.
Install sediment fences close to the site boundary and drains where
surface water may carry sediment off site.
Place gravel sausages across pit openings.
Air pollution Plant and Plant / machinery maintained in accordance with manufacturer
machinery recommendations.
Plant / machinery exhaust emissions monitored for smoke.
SITE ESTABLISHMENT PAGE 6 OF 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.