                                                                                 HOFFMAN DRIVE MEDICAL CENTRE
                                                                                BASEMENT AND RETENTION WORKS



3.1          ENVIRONMENTAL CONTROLS
All Kane projects require the development of a project specific Environmental Management Plan. This plan will
be developed with consideration to the site specific requirements and to ensure the project complies with EPA
guidelines and council bylaws. The project’s exposure to weather during demolition and construction emphasises
the need for rigorous management, specifically relating to water run-off and storm water control. Please note
some of the key risks and controls proposed for this project:

 ENVIRONMENTAL RISKS AND CONTROL

 RISK             SOURCE             CONTROL

 Noise               Plant             Plant /machinery maintained in accordance with manufacturer
                     Machinery          recommendations.
                     Construction      Silencers placed on large compressors / generators.
                      methods           Comply with council work hours.
                     Radios            Limit volume of radios.

 Dust                Ground            Protect areas of vegetation and minimise clearing / disturbance.
                      disturbance       Cover exposed ground with mulch or other suitable material.
                     Vehicle           Restrict vehicle movements.
                      movement          Dampen surfaces.
                     Dry powdery       Landscape and re-vegetate as soon as possible.
                      soils             Seed or cover soil stockpiles.

 Waste               Demolition        Utilise separate recycle bins for paper, steel etc (space permitting
                     Construction       onsite).
                      works             Use bin contractors who sort and recycle construction waste.
                     Packaging         Recycle demolished materials wherever possible.
                     Office            Place lids on domestic waste bins for odour and vermin control.
                      amenities

 Chemicals           Fuel              No bulk storage of fuel / oil onsite.
                     Oil               Paints, adhesives stored on site at minimum quantities in vented
                     Paint              containers/rooms.
                     Adhesives         All storage of chemicals shall comply with the Material Safety Data
                                         Sheet..
                                        Major servicing of plant e.g. where large quantities of oil requires
                                         changing shall be undertaken off site.

 Contamination       Paint             Use paint wash trough. Settled solids should be removed by an
 (from slurry /      Concrete           appropriate waste disposal company.
 wash water)          cutting           Designate a washing up and stone cutting area away from
 and soil            Paver cutting      stormwater drains. Build an earth bund to contain wash water from
 contamination       Stone cutting      concrete, stone cutting.

 Erosion and         Disturbed /       Protect and maintain natural vegetation and minimise clearing /
 sediment             cleared soils,     disturbance as much as possible.
 control              rain events       Connect downpipes to stormwater drainage as soon as possible or
                                         pipe roof water onto grassed areas.
                                        Install sediment fences close to the site boundary and drains where
                                         surface water may carry sediment off site.
                                        Place gravel sausages across pit openings.

 Air pollution       Plant and         Plant / machinery maintained in accordance with manufacturer
                      machinery          recommendations.
                                        Plant / machinery exhaust emissions monitored for smoke.




SITE ESTABLISHMENT                                                                                   PAGE 6 OF 13
Log in to download the original file

Attachment B - Construction Methodology KANE.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.