Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 9 3.3.2.2 Treatment Nodes The following devices have been used in the treatment train to reduce these pollutant loads to achieve WQO’s. Bio-Retention Basin – An area of 95m2 of designated Bio-retention to treat road, landscape, and roof catchments to achieve the WQO’s was modelled. An extended detention depth of 200mm with a filter media of 180mm/hr sandy loam hydraulic conductivity has been modelled. The location of these devices is shown on the attached Appendix A. Rainwater Tanks – A combined volume of 55,000L rainwater harvesting was modelled to receive 50% roofwater areas. This volume is to be re-used for irrigation purposes (excluding road reserve areas). Re-use rates for irrigation were calculated as follows: 5,167m 2 ground areas x 75% (areas to receive irrigation) x 0.548m annual irrigation, equating to 2,124kL/yr per the MUSIC Modelling Guidelines 3.3.3 Effectiveness in Pollution Reduction The water quality development model was set up with the incorporation of the above devices to reduce pollutant export to WQO levels. Table 3.5 indicates the predicted pollutant mean values of stormwater discharged from the site as calculated by MUSIC: Pollutant Percentage Load Reduction Total Suspended Solids (TSS) 83.2% Total Phosphorus (TP) 60.3% Total Nitrogen (TN) 56.2% Gross Pollutants (>5mm) 100% Table 3.5 - Flow Based Pollutant Load Reduction The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS, TP and TN generated by stormwater runoff in accordance with the targets required under the water quality objectives stated previously.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.