Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5551 - 28 Elkhorn Dr, Tewantin                                                                                 8




Under the proposed conditions, the site was ‘split’ into three land use catchment nodes; the roofed area,
driveways and ground level uses. The pollutant export parameters utilised were based on the Urban
Residential pollutant loads, refer Table 3.3 & 3.4.


                       Parameter                                                      Value
                Rainfall threshold (mm)                                                1
              Soil storage capacity (mm)                                              500
              Initial storage (% capacity)                                             10
                  Field capacity (mm)                                                 200
          Infiltration capacity coefficient (a)                                       211
           Infiltration capacity exponent (b)                                          5.0
                   Initial depth (mm)                                                  50
                Daily recharge rate (%)                                                28
                Daily baseflow rate (%)                                                27
             Daily deep seepage rate (%)                                               0
                        Table 3.3 – Rainfall-runoff Parameters Adopted (Urban Residential)



                                              TSS Log                 TP Log                         TN Log
 Flow Type       Surface Type
                                      Mean        Std Dev.    Mean        Std Dev.            Mean       Std Dev.
                      Roof              N/A         N/A        N/A             N/A            N/A             N/A
  Baseflow
                   Driveways            1.00        0.34      -0.97            0.31           0.20            0.20
Parameters
                 Ground Level           1.00        0.39      -0.97            0.31           0.20            0.20
                      Roof              1.30        0.39      -0.89            0.31           0.26            0.23
 Stormflow
                   Driveways            2.43        0.39      -0.30            0.31           0.26            0.23
Parameters
                 Ground Level           2.18        0.39      -0.47            0.31           0.26            0.23
                         Table 3.4 – Pollutant Export Values Adopted (Urban Residential)



3.3.2.1 Rainfall Data
Rainfall data for the site was chosen to give the best representation of actual conditions. A time period of
10 years between 1973 and 1983 was selected from the Cooroy Composite station, using a six minute time
step.
Log in to download the original file

Stormwater Management Plan.pdf · 899 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.