Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 7 During the construction phase of the development, silt fences should be erected downstream of all disturbed areas. In addition erosion and sediment control devices should be regularly inspected and maintained following storm events. An Erosion and Sediment Control Plan will be provided as part of the operational works application. 3.3 Operational Phase During the operational stage of the development, the following impacts have been identified in relation to stormwater runoff and water quality of the receiving waterways: Gross pollutants which include human derived litter, course sediment and vegetation Sediment and suspended solids Nutrients such as phosphorous and nitrogen To target these potential pollutants stormwater quality improvement devices (SQID’s) are proposed to be incorporated within the design. 3.3.1 Water Quality Objectives The water quality objectives (WQO’s) for this site were determined in accordance with Appendix 2 of the State Planning Policy (SPP) Dec 2013. Table 3.2 indicates the minimum load reduction targets required to be met: Pollutant Minimum Reduction Targets Total Suspended Sediments (TSS) 80% Total Phosphorus (TP) 60% Total Nitrogen (TN) 45% Gross Pollutants (>5mm) 90% Table 3.2 - Water Quality Objectives 3.3.2 Pollutant Export Modelling The Model for Urban Stormwater Improvement Conceptualisation (MUSIC) has been utilised to calculate pollutant loads from the proposed development and to predict performance characteristics of the proposed treatment train. Modelling parameters used were adopted from the Water by Design “Music Modelling Guidelines for South-East Queensland”, and the updated MUSIC Version 5 recommended parameters for Bio-retention basin nodes. MUSIC modelling setup and results are attached within Appendix B.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.